Powered by Made-in-China.com
Dual Clamping System Hydraulic Side Grip Pile Driver for Foundations
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-200Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
104kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
4.6 KgmCentrifugal Force
459 kNVibration Frequency
2300~3000 RpmSide Clamp Force
335kNBottom Clamp Force
385kNOperation Pressure
32 MPaWork Flow
170~230 L/MinWeight
2280 KgSuitable Excavator
20~25 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps tightly grip piles, eliminating extra equipment needs.
Low Clearance Capability: Designed for minimal vertical clearance in tunnels, under bridges, and factories.
Versatile Pile Compatibility: Handles steel sheets, H-beams, and pipe piles with quick clamp changes.
Self-Sufficient Operation: Performs clamping, positioning, driving, and extraction without auxiliary cranes.
ISO 9001:2015 Certified: Adheres to strict quality standards with high-strength materials and durable frames.
Customization Options: Color scheme and logo application available to match specific fleet requirements.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
We adhere to ISO 9001:2015. High-strength materials and durable frame ensure low maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency effectively target compacted soils and mixed layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Hydraulic Side Grip Pile Driver Sv-200 for Sheet Pile & H-Beam 360° Rotation Low Noise Piling Equipment
US$100,000.00-10,000,000.00
1 Set(MOQ)
30 Ton Excavator Attachment Vibratory Pile Driver for Steel Sheet Pile / H Beam with Side Grip
US$8,999.00-18,000.00
1 Piece(MOQ)
Advanced Foundation Tool: Dual Clamping System Pile Driver with 2300 Rpm
US$100,000.00-10,000,000.00
1 Set(MOQ)
High Efficiency 360° Hydraulic Pile Driver with Advanced Side Grip
US$100,000.00-10,000,000.00
1 Set(MOQ)
15 20 25 Ton Excavator Mounted Hydraulic Solar Pile Post Driver Vibro Hammer Side Grip Piling Machine Big Sheet Pile Driver for Fenders
US$12,000.00-15,000.00
1 Piece(MOQ)
Heavy-Duty Sv-400 Side Grip Pile Driver for Tough Jobs
US$100,000.00-10,000,000.00
1 Set(MOQ)
High Quality Vibratory Pile Driver with Hydraulic Side Clamp for 20 Ton Excavator
US$22,000.00
1 Piece(MOQ)
Factory 360 Degree Tilting Pile Foundation Excavator Side Clamp Pile Driver
US$22,000.00-22,500.00
1 Piece(MOQ)
Hydraulic Pile Driver Attachment for 20 Ton Excavator with Side Grip
US$22,000.00
1 Piece(MOQ)
Excavator Vibro Pile Driver with Side Grip Clamp
US$25,000.00
1 Piece(MOQ)
OEM/ODM Excavator Parts Side Grip Vibro Hammer Hydraulic Static Pile Driver for 12m Steel Piles Ms03 Ms08
US$9,999.00-21,900.00
1 Piece(MOQ)
Bullattach Hydraulic Side Grip Pile Driver OEM Factory for 15 Ton Excavator
US$20,000.00
1 Piece(MOQ)
Hydraulic Pile Driver Side Grip Vibro Hammer for Steel Sheet Pile Driver Hammer 20-30ton Excavator
US$12,000.00-15,000.00
1 Piece(MOQ)
High-Efficiency Hydraulic Solar Pile Driver for Photovoltaic Ground Mounting Systems
US$10,000.00-39,800.00
1 Set(MOQ)
T·Works Zyc3400kN-8400kN Medium Size Walking-Type Hydraulic Static Pile Driver for Urban Residential Foundation Piles
US$120,000.00-278,697.00
1 Set(MOQ)
Juxiang Side Grip Hydraulic Pile Driver Designed for 30 Tons Excavators
US$33,000.00-35,000.00
1 Piece(MOQ)
20 Ton Excavator Mounted Hydraulic Solar Pile Post Driver Vibro Hammer Side Grip Piling Machine Big Sheet Pile Driver for Fenders
US$10,000.00-15,000.00
1 Piece(MOQ)



















