Powered by Made-in-China.com
Dynamic Vibro Hammer for Enhanced Foundation Work Efficiency
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Low Clearance Capability: Side grip with dual clamping enables operations in minimal vertical clearance spaces.
360-Degree Continuous Rotation: Allows precise pile positioning from any angle, enhancing piling efficiency.
Dual Clamping System: Side and bottom clamps securely grip piles, eliminating extra handling equipment.
Versatile Pile Compatibility: Replaceable clamp seat fits multiple pile types with quick changeovers.
Self-Sufficient Operation: Completes piling process independently without cranes or support equipment.
ISO 9001:2015 Certified: Adheres to international quality standards with high-strength materials.
1-Year Warranty Coverage: Comprehensive 12-month warranty for all mechanical equipment.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
We adhere to ISO 9001:2015. High-strength materials and a durable frame ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency target compacted soils and mixed layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Hot Selling High Efficiency Fully Hydraulic System Vibro Hammer for Foundation Works
US$25,000.00-25,300.00
1 sets(MOQ)
Vibro Hammer for Enhanced Foundation Piling and Construction Efficiency
US$100,000.00-10,000,000.00
1 Set(MOQ)
High Efficiency Rt-150A 150kw Electric Vibro Pile Hammer for Piling and Foundation Work on Construction Sites
US$62,900.00-83,900.00
1 Piece(MOQ)
High-Efficiency Electric Vibro Hammer for Foundation Improvement Works
US$62,900.00-83,900.00
1 Piece(MOQ)
One-Stop Solution Multiple Piles Suitable Pile Driver Side Grip Vibro Hammer for Foundation Work
US$23,350.00
1 Piece(MOQ)
Heavy-Duty Vibro Hammer for Efficient Piling and Foundation Work S350 S500
US$22,000.00-23,000.00
1 Piece(MOQ)
Brand New High-Performance Box Type Excavator Hammer for Foundation Work
US$780.00-800.00
1 Piece(MOQ)
Electric Vibro Hammer for Efficient Soft Soil Foundation Works
US$62,900.00-83,900.00
1 Piece(MOQ)
Hydraulic Pile Hammer for Precise and Powerful Foundation Work Applications
US$2,000.00
1 Piece(MOQ)
Professional Hydraulic Vibro Hammer with Cylinder Tilting for Durable Foundation Work
US$22,000.00-23,000.00
1 Piece(MOQ)
High Efficiency Side Grip Pile Driver Vibro Hammer for 20-30 Ton Excavator
US$23,200.00
1 Piece(MOQ)
Heavy-Duty Vibro Pile Hammer for Efficient Foundation Work
US$33,000.00-35,000.00
1 Piece(MOQ)
Pile Hammer Vibro Hammer Mounted Excavator for Foundation Pile
US$21,500.00-24,150.00
1 Set(MOQ)
Powerful Excavator Attachment Vibro Hammer for Efficient Foundation Work
US$100,000.00-1,000,000.00
1 Set(MOQ)
Innovative Excavator Attachment 360 Degree Vibro Hammer for Foundation Work
US$100,000.00-1,000,000.00
1 Set(MOQ)
Multi-Function High Efficiency Hydraulic Photovoltaic Solar Pile Drivers with Hammer Pile and Screw Pile for/
US$9,400.00-10,000.00
1 Piece(MOQ)
Dynamic Electric Vibro Hammer for High-Performance Foundation Applications
US$62,900.00-83,900.00
1 Piece(MOQ)
Robust Electric Foundation Hammer for Enhanced Piling Efficiency
US$100,000.00-1,000,000.00
1 Roll(MOQ)



















