Powered by Made-in-China.com
Eccentric Moment Vibro Hammer for Effective Piling Machinery Solutions
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
360-Degree Continuous Rotation: Enables precise pile positioning from any angle for maximum efficiency.
Dual Clamping System: Side and bottom clamps grip piles during driving and extraction without extra handling.
Low Clearance Capability: Side grip design allows operations in minimal headroom where top-drive hammers fail.
Versatile Pile Compatibility: Accommodates steel sheets, H-beams, and pipe piles with quick changeovers.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction independently without cranes.
ISO 9001:2015 Certified: Ensures high quality and durability with high-strength materials.
Customizable Color and Logo: Machine can be customized to match your fleet branding and color requirements.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics for SE Asia, India, Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color and logo.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 compliance. High-strength materials for minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High force and adjustable frequency for compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Eccentric Hammer for Efficient Foundation Piling Solutions and Performance
US$100,000.00-10,000,000.00
1 Set(MOQ)
Eccentric Hammer for Advanced Vibro Piling and Construction Use
US$100,000.00-10,000,000.00
1 Set(MOQ)
120kw Crane Type Electric Hammer for Vibro Piling Solutions
US$57,000.00-60,000.00
1 Set/Sets(MOQ)
Vibro Hammer for Reliable Low Clearance Foundation Piling Solutions
US$100,000.00-10,000,000.00
1 Set(MOQ)
Side Grip Vibro Hammers, Side Grip Piling Machine Hydraulic Vibro Pile Hammer for/
US$9,400.00-10,000.00
1 Piece(MOQ)
Compact Vibro Hammer for Efficient Narrow Space Piling Solutions
US$100,000.00-10,000,000.00
1 Set(MOQ)
Advanced Juxiang S350 Vibro Hammer for Effective Piling Solutions
US$22,000.00-23,000.00
1 Piece(MOQ)
One-Stop Solution Multiple Piles Suitable Pile Driver Side Grip Vibro Hammer for Foundation Work
US$23,350.00
1 Piece(MOQ)
High-Performance Excavator Vibro Hammer for Quick Piling Solutions
US$20,000.00
1 Piece(MOQ)
Dynamic Electric Vibro Hammer for Effective Pile Installation Solutions
US$62,900.00-83,900.00
1 Piece(MOQ)
Zss500 Hydraulic Vibro Pile Drive Hammer for Site Pile Zosin Cost-Effective
US$15,000.00-22,000.00
1 Piece(MOQ)
Compact Electric Vibro Hammer for Effective Pile Driving Solutions
US$62,900.00-83,900.00
1 Piece(MOQ)
High-Performance S500 Hydraulic Vibro Hammer for Piling Applications
US$10,000.00
1 Piece(MOQ)
800 N · M Eccentric Moment 150kw Electric Vibro Pile Hammer for Plastic Sheet Piles in Light Duty Retaining and Water Control Jobs
US$62,900.00-83,900.00
1 Piece(MOQ)
Excavator Pile Driving Machine - Vibro Hammer for Road and Bridge Construction
US$10,000.00
1 Piece(MOQ)
Advanced Excavator Motor Tilting Vibro Hammer for Effective Building Solutions
US$21,500.00-22,000.00
1 Piece(MOQ)
Powerful Hydraulic Vibro Hammer for Fast Piling Solutions
US$12,000.00-12,500.00
1 Piece(MOQ)
China Factory Screw Piling Machine Hydraulic Pile Driver Hammer for Solar Engineering
US$9,400.00-10,000.00
1 Piece(MOQ)



















