Powered by Made-in-China.com
Efficient Construction Machinery: Heavy-Duty Driver with Superior Performance
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps grip piles during driving and extraction without extra equipment.
360-Degree Rotation: Full rotation allows precise pile positioning from any angle without repositioning excavator.
Low Clearance Capability: Side grip design enables operations in limited headroom like tunnels and under bridges.
Versatile Pile Compatibility: Handles steel sheets, H-beams, and pipes with replaceable clamp seats.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction independently without cranes.
ISO 9001:2015 Certified: Manufactured under certified quality standards for high durability and low maintenance.
Custom Configurations: Available in custom colors, logos, and specific design modifications upon request.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time?
A:
15-35 days ex-works. Logistics available for Asia, India, Russia.
Q:Can the machine match our fleet?
A:
Yes. Custom color and logo are available.
Q:What about quality and durability?
A:
ISO 9001:2015 certified with high-strength construction for low maintenance.
Q:Is it suitable for hard soils?
A:
Yes. High force and adjustable frequency handle compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
High - Performance Hydraulic Static Pile Driver with Counterweight Design Heavy Construction Machinery
US$120,000.00-278,000.00
1 Set(MOQ)
Efficient Construction Machinery: Heavy-Duty Driver with Superior Vibration
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Fv-700 Eccentric Pile Driver for Efficient Construction
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty S700 Excavator Vibro Pile Driver for Efficient Construction
US$38,000.00-41,000.00
1 Piece(MOQ)
Heavy-Duty Pile Driver for Enhanced Construction Machinery Performance
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Fv-330 Pile Driver with Superior Vibration Force
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty 40 Ton Hydraulic Vibro Pile Driver for Efficient Construction
US$23,000.00-24,000.00
1 Piece(MOQ)
Heavy-Duty Pile Driver Zyc120b-B for Enhanced Construction Performance
US$130,000.00
1 Set(MOQ)
Heavy-Duty Silent Pile Driver for Efficient Construction Tasks
US$120,000.00-278,697.00
1 Set(MOQ)
Juxiang Heavy-Duty Excavator Vibro Pile Driver for Efficient Construction
US$23,000.00-24,000.00
1 Piece(MOQ)
Heavy-Duty 600t Concrete Pile Driver Machine for Efficient Construction
US$100,000.00-378,697.00
1 Set(MOQ)
Heavy-Duty Hydraulic Vibratory Pile Driver for Efficient Construction
US$12,000.00-20,000.00
1 Piece(MOQ)
Heavy-Duty SDLQ LG-4 Solar Pile Driver for Efficient Installation piling machine
US$22,000.00-26,000.00
1 Piece(MOQ)
Jzl90 Heavy-Duty Pile Driver for Efficient Construction Projects
US$160,000.00-165,000.00
1 set(MOQ)
Heavy-Duty Jzl90 Construction Pile Driver for Efficient Groundwork
US$165,000.00-170,000.00
1 Piece(MOQ)
Jzb240 Walking Pile Driver for Heavy Duty Construction
US$333,300.00-333,333.00
1 Set(MOQ)
Heavy-Duty Jzb60 Construction Pile Driver for Efficient Groundwork
US$135,000.00-140,000.00
1 Piece(MOQ)
Heavy-Duty SDLQ LG-4 Solar Pile Driver for Efficient Ground Installation
US$22,000.00-26,000.00
1 Piece(MOQ)
SDLQ LG-4 Solar Pile Driver Rig 4m Depth, 5.5T Heavy Duty Machine solar piles driller machine
US$22,000.00-26,000.00
1 Piece(MOQ)



















