Powered by Made-in-China.com
Heavy-Duty Compact Pile Driver Fv-330 for Efficient Construction Projects
US$100,000.00-1,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
FV-330Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
93.9kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewVibration Frequency
2800 RpmCentrifugal Force
372 kNEccentric Moment
6.8 KgmOperation Pressure
32 MPaWork Flow
252 L/MinMax.Pile Length
12mSuitable Excavator
33~38 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Solar Farm Specialization: Tailored exclusively for photovoltaic industry piling applications with optimized performance.
High Exciting Force: Delivers 372 kN centrifugal force, outperforming traditional medium-sized pile drivers.
Compact Lightweight Design: Ultra-compact structure enables flexible operation in confined spaces while maintaining power.
Global Components: Powered by renowned hydraulic motors and German bearings for superior reliability.
Cost-Effective Operation: Optimized fuel efficiency reduces machinery investment and daily operating costs.
Proven Field Performance: Validated across diverse photovoltaic projects for stable piling in various soil conditions.
12-Month Warranty: Standard 12-month warranty coverage with global 24/7 technical assistance and spare parts.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
We adhere to ISO 9001:2015. High-strength materials and a durable frame ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency effectively target compacted soils and mixed layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Versatile Drill Rig Static Pile Driver for Efficient Piling Operations Heavy Construction Equipment
US$261,000.00-270,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver for Effective Piling Operations
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty 90-Ton Hydraulic Pile Driver for Construction Excellence
US$130,000.00
1 Set(MOQ)
Heavy-Duty Static Pile Driver for Large Construction Sites
US$150,000.00-278,697.00
1 Set(MOQ)
Heavy-Duty 360° Vibratory Pile Driver for Strong Foundations
US$100,000.00-1,000,000.00
1 Set(MOQ)
Powerful Jzl90 Construction Pile Driver for Heavy-Duty Projects
US$165,000.00-170,000.00
1 Piece(MOQ)
Heavy-Duty Excavator Piling Driver for Precision Construction Tasks
US$100,000.00-1,000,000.00
1 Set(MOQ)
Efficient Pile Driver with 2800 Rpm for Heavy-Duty Applications
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver for Small Foundation Projects
US$300,000.00
1 Set(MOQ)
Heavy-Duty Excavator Vibratory Driver for Efficient Pile Installation
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver for Large-Scale Construction Projects
US$34,500.00-35,000.00
1 Piece(MOQ)
Diesel Hammer Pile Driver with Enhanced Performance for Heavy-Duty Projects
US$2,000.00
1 Piece(MOQ)
Heavy-Duty SDLQ LG-4 Solar Pile Driver for Efficient Installation piling machine
US$22,000.00-26,000.00
1 Piece(MOQ)
Premium Heavy Duty Solar Pile Driver for Complex Terrain Photovoltaic Project Works
US$26,600.00-26,890.00
1 Piece(MOQ)
Powerful Vibratory Sheet Pile Driver for Efficient Construction Projects
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy Duty Excavator Vibratory Pile Driver for Steel Pipe Pile Foundation Construction
US$11,500.00-12,800.00
1 Set(MOQ)
Heavy-Duty Jzl90 Pile Driver for Fast Construction Success
US$165,000.00-170,000.00
1 Piece(MOQ)
Compact Pile Driver for Residential and Light Construction
US$29,800.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver for Solar Projects
US$20,999.00-24,999.00
1 Piece(MOQ)
Heavy-Duty Jzb60 Construction Pile Driver for Efficient Groundwork
US$135,000.00-140,000.00
1 Piece(MOQ)



















