Powered by Made-in-China.com
Heavy-Duty Driver with Superior Vibration Frequency for Pile Installation
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps grip piles for driving and extraction without extra equipment.
360-Degree Rotation: Full rotation enables precise pile positioning from any angle without repositioning excavator.
Low Clearance Capability: Side grip design allows operations in limited headroom like tunnels and under bridges.
Versatile Pile Compatibility: Accommodates steel sheets, H-beams, and circular pipes with quick clamp changes.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction independently without cranes.
ISO 9001:2015 Certified: High-strength materials ensure durability and minimal maintenance.
Custom Configurations: Customizable color and logo available upon request.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time?
A:
Lead time is 15-35 days ex-works. Logistics available for Asia, India, and Russia.
Q:Can the machine match our fleet?
A:
Yes. Customization includes color and logo.
Q:What is the machine's quality and durability?
A:
ISO 9001:2015 certified. High-strength materials ensure minimal maintenance.
Q:Is it suitable for hard soil conditions?
A:
Yes. High force and adjustable frequency target compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty Hydraulic Pile Driver for Effective Piling Operations
US$100,000.00-1,000,000.00
1 Set(MOQ)
Powerful Hydraulic Pile Driver for Heavy-Duty Construction Machinery
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver Zyc120b-B for Construction Projects
US$130,000.00
1 Set(MOQ)
Heavy-Duty Sv-300 Compact Pile Driver for Tight Spaces
US$100,000.00-10,000,000.00
1 Set(MOQ)
Precision Driver for Heavy-Duty Eccentric Pile Driving Applications
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Zyc120b-B Hydraulic Pile Driver for Extreme Conditions
US$130,000.00
1 Set(MOQ)
Zyc460ton Heavy-Duty Static Pile Driver for Precision Installations
US$300,000.00
1 Set(MOQ)
Heavy-Duty Juxiang Side Grip Pile Driver for 30-Ton Excavators
US$33,000.00-35,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver with 8t Lifting Power
US$300,000.00
1 Set(MOQ)
Juxiang Heavy-Duty Excavator Vibro Pile Driver for Efficient Construction
US$23,000.00-24,000.00
1 Piece(MOQ)
Heavy-Duty SDLQ LG-4 Solar Pile Driver for Efficient Installation piling machine
US$22,000.00-26,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver for Long-Lasting Construction Solutions
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Juxiang Hydraulic Pile Driver for Industrial Applications
US$23,000.00-24,000.00
1 Piece(MOQ)
Heavy Duty 1 Year Warranty Hydraulic Pile Driver for 500-1600mm Drilling with ISO 9001: 2000
US$50,000.00-55,000.00
1 Set(MOQ)
Heavy-Duty Drilling Rig Pile Driver for Guardrail Installation
US$20,999.00-24,999.00
1 Piece(MOQ)
Heavy-Duty Jzb90 Pile Driver for Efficient Ground Installation
US$155,000.00-160,000.00
1 Piece(MOQ)
Heavy-Duty SDLQ LG-4 Solar Pile Driver for Efficient Ground Installation
US$22,000.00-26,000.00
1 Piece(MOQ)
Diesel Hammer Pile Driver with Enhanced Performance for Heavy-Duty Projects
US$2,000.00
1 Piece(MOQ)
Jzb240 Walking Pile Driver for Heavy Duty Construction
US$333,300.00-333,333.00
1 Set(MOQ)
Premium Heavy Duty Solar Pile Driver for Complex Terrain Photovoltaic Project Works
US$26,600.00-26,890.00
1 Piece(MOQ)



















