Powered by Made-in-China.com
Heavy-Duty Equipment for Excavators Featuring High Frequency Piling Hammer
US$100,000.00-1,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
FV-700Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
202.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewVibration Frequency
2800 RpmCentrifugal Force
915 kNEccentric Moment
12.3kgmOperation Pressure
32 MPaWork Flow
380 L/MinMax.Pile Length
24mSuitable Excavator
65~75tTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Superior Vibration Power: Equipped with Parker motors, German bearings, and top gear delivering up to 1064 kN force.
Intelligent Electronic Control: Electronic control system optimizes performance, extends lifespan, and enhances safety.
Versatile Application Scenarios: Ideal for bridge piers, port construction, marine offshore, and urban infrastructure projects.
ISO 9001:2015 Certified: Compliance with international quality standards ensures high-strength materials and durability.
Global 24/7 Support: Round-the-clock technical assistance and parts supply available worldwide.
Customizable Configurations: Tailored designs available for specific needs including color and logo application.
Multiple Model Options: Available in FV-500 to FV-900 series with varying frequencies and pile lengths.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for SEA, India, Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color and logo application.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 compliance. High-strength materials ensure low maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency target compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
All Terrain Crawler Solar Piling Equipment for Uneven Wilderness Sites
US$1,994.00-2,194.00
1 Piece(MOQ)
New Design Drilling Piling Screwing Hydraulic Pile Equipment for Road Construction
US$23,999.00-26,999.00
1 Piece(MOQ)
Cost-Effective Small Rotary Micropile Borehole Jet Grouting Drilling Rig Equipment for Consistent Piling Quality
US$20,000.00-25,000.00
1 Set(MOQ)
Removable Drill Bits Equipment for Engineering Rotary Drilling Rig Construction Machinery
US$1,800.00-3,500.00
1 Piece(MOQ)
Your Best Choice Hf168A High Position-Oriented Borehole Drilling Equipment
US$250,000.00-300,000.00
1 Piece(MOQ)
Tysim Kr300e Rotary Drilling Rig Piling Construction Equipment
US$647,000.00-684,000.00
1 Set(MOQ)
Hfpv-1b Speediness Drilling Equipment for Photovoltaic Power Station Foundation
US$30,000.00-40,000.00
1 Set(MOQ)
Heavy-Duty Piling Driver and Precision Equipment for Excavators
US$100,000.00-1,000,000.00
1 Set(MOQ)
Tysim Kr125A Rotary Drilling Rig Construction Piling Equipment
US$278,000.00
1 Piece(MOQ)
Precision Driver Equipment for Heavy-Duty Piling Tasks and Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy Duty Compact Construction Equipment for Piling Solutions
US$300,000.00
1 Set(MOQ)
Mini Hydraulic Sheet Portable Static Pile Driver Pneumatic Pile Driving Rigs Equipment for Wells
US$5,000.00-6,000.00
1 Set(MOQ)
Kr300ds Small Tysim Pile Drilling Equipment Depth 26m High Stability
Negotiable
1 Piece(MOQ)
Heavy-Duty Piling Equipment with Precision Driver for Excavators
US$100,000.00-1,000,000.00
1 Set(MOQ)
Tysim Kr300e Rotary Drilling Rig Piling Equipment
US$647,000.00-684,000.00
1 Set(MOQ)
Heavy-Duty Piling Equipment with Precision Driver for Excavator Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Mobile Drilling Rig, Borehole Drilling Machine Hydraulic Rotary Piling Equipment
US$87,000.00
1 Piece(MOQ)



















