Powered by Made-in-China.com
Heavy-Duty Hydraulic Hammer for Reliable Bridge Foundation Piling
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-200Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
104kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
4.6 KgmCentrifugal Force
459 kNVibration Frequency
2300~3000 RpmSide Clamp Force
335kNBottom Clamp Force
385kNOperation Pressure
32 MPaWork Flow
170~230 L/MinWeight
2280 KgSuitable Excavator
20~25 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
360-Degree Continuous Rotation: Full rotation allows precise pile positioning from any angle, boosting piling efficiency.
Low Clearance Capability: Side grip with dual clamps enables operations in minimal vertical spaces where top-drive hammers fail.
Versatile Pile Compatibility: Standard clamp seat accommodates multiple pile types like sheets, H-beams, and pipes with quick switches.
ISO 9001:2015 Certified: High-strength materials and durable frame ensure minimal upkeep and quality assurance.
Customizable Color and Logo: Machine can be customized to match fleet requirements with specific color and logo options.
Global 24/7 Technical Support: Engineers available via email, phone, or online platform with parts supply support.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Optimized for SEA, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color and logo.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 standards. High-strength materials and durable frame ensure minimal upkeep.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High force and adjustable frequency target compacted soils effectively.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty 18-26 Ton Excavator Vibratory Hammer for Piling
US$12,000.00-15,000.00
1 Piece(MOQ)
Heavy-Duty Foundation Vibro Hammer for Tough Pile Driving Needs
US$62,900.00-83,900.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Vibro Hammer for Fast Foundation Installation
US$12,000.00-15,000.00
1 Piece(MOQ)
Heavy-Duty S350 Excavator Vibro Hammer for Reliable Foundation Work
US$22,000.00-23,000.00
1 Piece(MOQ)
Efficient Vibro Hammer for Heavy-Duty Foundation Construction Needs
US$100,000.00-1,000,000.00
1 Set(MOQ)
High-Performance Vibro Hammer for Durable Bridge Building Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty 50 Ton Hydraulic Vibro Hammer for Efficient Piling Solutions
US$38,000.00-41,000.00
1 Piece(MOQ)
Heavy-Duty Side Grip Vibro Hammer for Precision Piling
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Vibro Pile Hammer for Sheet Piling Efficiency
US$16,500.00-30,000.00
1 sets(MOQ)
Heavy-Duty Hydraulic Vibro Hammer for Efficient Pile Driving
US$21,500.00-24,150.00
1 Set(MOQ)
Heavy-Duty Hydraulic Hammer for Photovoltaic Pile Driving Efficiency
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Electric Vibro Hammer for Reliable Foundation Projects
US$62,900.00-83,900.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Hammer for 20 Tons Excavator Zsb750
US$2,000.00-4,500.00
1 Piece(MOQ)
Heavy-Duty Electric Hammer for Reliable Vibro Pile Driving Tasks
US$62,900.00-83,900.00
1 Piece(MOQ)
Durable Hydraulic Hammer for Heavy-Duty Demolition and Excavation
US$2,000.00-4,500.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Hammer for Efficient Sheet Pile Installation
US$15,500.00-16,000.00
1 sets(MOQ)
Heavy Duty No Pollution Wholesale Piling Hammer for Bridges
US$100,000.00-178,697.00
1 Set(MOQ)
Heavy-Duty Electric Vibro Pile Piling Hammer for Deep Foundation Installation
US$62,900.00-83,900.00
1 Piece(MOQ)
High-Performance Hydraulic Diesel Hammer for Solar Foundation Piling
US$9,800.00-25,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Vibro Pile Hammer for Construction Projects
US$20,000.00-22,000.00
1 Piece(MOQ)



















