Powered by Made-in-China.com
Heavy-Duty Hydraulic Pile Driver for Efficient Construction Projects
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Low Clearance Capability: Side grip design allows piling in spaces with minimal vertical clearance.
360-Degree Continuous Rotation: Enables precise pile positioning without needing to reposition the excavator.
Dual Clamping System: Side and bottom clamps securely grip piles, eliminating extra handling equipment.
Versatile Pile Compatibility: Handles sheet piles, H-beams, and pipe piles with quick changes.
Self-Sufficient Operation: Clamps, positions, drives, and extracts piles without cranes or support equipment.
ISO 9001:2015 Certified: Compliant with international quality standards for durability and low maintenance.
Global 24/7 Support: Round-the-clock technical support and parts supply available worldwide.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days. Logistics for Southeast Asia, India, Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes, customization includes color and logo.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 compliant. Strong materials ensure low maintenance.
Q:Is it suitable for hard soil conditions?
A:
Yes. High force and adjustable frequency for compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
High - Performance Hydraulic Static Pile Driver with Counterweight Design Heavy Construction Machinery
US$120,000.00-278,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with 360° Rotating Grip for Construction
US$100,000.00-10,000,000.00
1 Set(MOQ)
Advanced Versatile Drill Rig Static Pile Driver for Efficient Piling Operations Heavy Construction Equipment
US$261,000.00-270,000.00
1 Set(MOQ)
Powerful Dynamic Hydraulic Pile Driver for Construction Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
High Performance Hydraulic Pile Driver for Construction Projects
US$120,000.00-478,697.00
1 Set(MOQ)
Heavy-Duty Hydraulic Piling Driver for Enhanced Vibration Control
US$100,000.00-10,000,000.00
1 Set(MOQ)
Reliable Hydraulic Pile Driver for Heavy Construction Machinery Use
US$100,000.00-1,000,000.00
1 Set(MOQ)
Powerful Juxiang Excavator Mounted Hydraulic Pile Driver Hammer for Efficient Construction Projects
US$23,000.00-24,000.00
1 Piece(MOQ)
High-Performance Jzl120 Pile Driver for Robust Construction Projects
US$175,000.00-180,000.00
1 Piece(MOQ)
Goodeng GPY228 Hydraulic Static Pile Driver Heavy-Duty Pile Driving Construction Equipment
US$150,000.00-250,000.00
1 Piece(MOQ)
Compact Hydraulic Pile Driver for Mini Excavators in Construction Projects
US$10,000.00-12,000.00
1 Piece(MOQ)
Heavy-Duty SDLQ LQR-120 Hydraulic Pile Driver for Concrete
US$70,000.00-80,000.00
1 Piece(MOQ)
Fuel-Efficient Diesel Solar Spiral Pile Driver for Remote off-Grid Solar Construction Sites
US$10,000.00-39,800.00
1 Set(MOQ)
Jzl120 Hydraulic Pile Driver for Construction Projects
US$175,000.00-180,000.00
1 Piece(MOQ)
Powerful Juxiang S350 Vibrating Pile Driver for Construction Projects
US$22,000.00-23,000.00
1 Piece(MOQ)
Powerful Eccentric Torque Pile Driver for Heavy-Duty Applications
US$13,500.00-14,000.00
1 Piece(MOQ)
Heavy-Duty Jzb60 Pile Driver for Efficient Ground Foundation Work
US$135,000.00-140,000.00
1 Piece(MOQ)
Heavy Duty Pile Driver for Construction Site
US$184,600.00
1 Piece(MOQ)
Heavy Duty Solar Pile Driver for Hard Soil Pile Driving
US$22,800.00-24,000.00
1 Piece(MOQ)



















