Powered by Made-in-China.com
Heavy-Duty Piling Driver with Balanced Force for Deep Foundations
US$100,000.00-1,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
FV-700Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
202.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewVibration Frequency
2800 RpmCentrifugal Force
915 kNEccentric Moment
12.3kgmOperation Pressure
32 MPaWork Flow
380 L/MinMax.Pile Length
24mSuitable Excavator
65~75tTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Superior Vibration Power: Equipped with Parker motors, German bearings, and up to 1064 kN force.
High-Clamping Cast Steel Gripper: Features super-strong cast steel clamp jaws with 650 kN clamping force.
Intelligent Electronic Control System: New electronic system optimizes performance, lifespan, precision, and safety.
Versatile Application Scenarios: Ideal for bridge piers, port construction, marine projects, and urban infrastructure.
Global Technical Support: 24/7 technical assistance and spare parts supply available worldwide.
ISO 9001:2015 Certified: Ensures high quality and durability with minimal upkeep requirements.
Customizable Configurations: Color, logo, and technical specs can be tailored to match specific fleet needs.
Diverse Model Range: Available in FV-500 to FV-900 models with varying pile lengths up to 32m.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for SEA, India, Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color and logo application.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 compliance. High-strength materials ensure minimal upkeep.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency target compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Versatile Drill Rig Static Pile Driver for Efficient Piling Operations Heavy Construction Equipment
US$261,000.00-270,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with 120t Power Capacity
US$120,000.00-278,697.00
1 Set(MOQ)
Balanced Force Driver for Enhanced Performance in Piling Equipment
US$100,000.00-1,000,000.00
1 Set(MOQ)
Deep Foundation Driver with Eccentric Moment for Large Excavator Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
T-Works Hydraulic Static Pile Driver for Small Projects with Big Piling Force
US$261,000.00-270,000.00
1 Set(MOQ)
Efficient Heavy-Duty Driver with 372 kN Centrifugal Force Design
US$100,000.00-1,000,000.00
1 Set(MOQ)
Balanced Force Driver with Centrifugal Force for Construction Machinery
US$100,000.00-1,000,000.00
1 Set(MOQ)
LG-3.5 Heavy-Duty Foundation Pile Driver – 3.5m Deep, 500mm Diameter for Secure Installations
US$22,000.00-26,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver with Enhanced Capacity Design
US$150,000.00
1 Set(MOQ)
Heavy-Duty 6T Solar Farm Pile Driver for Deep Foundations
US$22,000.00-26,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Piling Driver for 12-17 Ton Excavators
US$10,000.00-12,000.00
1 Piece(MOQ)
Heavy Duty Crawler Pile Driver for PV Panel Foundation
US$23,000.00-25,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Ground Screw Pile Driver for Foundations
US$22,000.00-26,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver for Efficient Foundation Construction
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Jzb60 Pile Driver for Efficient Ground Foundation Work
US$135,000.00-140,000.00
1 Piece(MOQ)
Juxiang Heavy-Duty Excavator Hydraulic Vibratory Pile Driver for Piling Installations
US$23,000.00-24,000.00
1 Piece(MOQ)
Heavy Duty 1 Year Warranty Hydraulic Pile Driver for 500-1600mm Drilling with ISO 9001: 2000
US$50,000.00-55,000.00
1 Set(MOQ)
High Striking Force and High Working Efficiency Handheld Heavy Duty Post Driver
US$1,888.00
1 Set(MOQ)
Heavy Duty 30 Ton Hydraulic Pile Driver for Efficient Sheet Piling
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Post Driver with Ergonomic Grip for Easy Use
US$3.99-5.99
350 Sets(MOQ)



















