Powered by Made-in-China.com
Heavy-Duty Piling Equipment with Intelligent Eccentric Driver Technology
US$100,000.00-1,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
FV-600Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewVibration Frequency
2800 RpmCentrifugal Force
818 kNEccentric Moment
10.2kgmOperation Pressure
32 MPaWork Flow
350 L/MinMax.Pile Length
21mSuitable Excavator
50~65tTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Superior Vibration Power: Delivers up to 1064 kN force using Parker motors and German bearings for tough conditions.
High-Clamping Force: Cast steel gripper with 160-180 cylinders offers 650 kN max clamping force for secure grip.
Intelligent Control System: New electronic control optimizes performance, extends lifespan, and enhances precision.
Versatile Applications: Ideal for high-rise foundations, bridges, ports, offshore platforms, and urban infrastructure.
Global Technical Support: 24/7 technical assistance and spare parts supply available worldwide.
ISO 9001 Certified: Manufactured with ISO 9001:2015 compliance ensuring high quality and durability.
Custom Configurations: Custom designs available for color, logo, and specific project requirements.
1-Year Warranty: Comprehensive 12-month warranty coverage for all mechanical defects.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
1 Set
Q:What is the delivery lead time to our region?
A:
15-35 days ex-works. Logistics optimized for SE Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color and logo application.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 compliance. Strong materials ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency target compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Premium Quality Hydraulic Static Pile Driver Bridge Construction Piling Equipment
US$799.00-1,350.00
1 Set(MOQ)
290A 150kw Vibroflot Equipment with Vibro Replacement Stone Column Technique
Negotiable
1 Piece(MOQ)
New Design Drilling Piling Screwing Hydraulic Pile Equipment for Road Construction
US$23,999.00-26,999.00
1 Piece(MOQ)
Mini Piledriver Pile Driving Foundation Construction Machinery Pile Driver Drilling Equipment
US$3,000.00-20,999.00
1 Piece(MOQ)
Tysim Kr300e Rotary Drilling Rig Piling Construction Equipment
US$647,000.00-684,000.00
1 Set(MOQ)
Diesel Powered Portable Solar Stake Piling Drilling Equipment
US$1,994.00-2,194.00
1 Piece(MOQ)
Excavator Equipment with Heavy-Duty Piling Driver for Precision Work
US$100,000.00-1,000,000.00
1 Set(MOQ)
Zcq75 Construction Ground Improvement Vibroflot Equipment
US$25,000.00
1 Piece(MOQ)
Hf330 Hydraulic Rotary Borehole Coal Mining Drilling Rig Surface Drilling Equipment
US$110,000.00
1 Set(MOQ)
Precision Driver Equipment for Heavy-Duty Piling Applications and Tasks
US$100,000.00-1,000,000.00
1 Set(MOQ)
Hydraulic Factory Stone Column Equipment Vibroflot Equipment Electric Vibroflot
US$25,000.00
1 Piece(MOQ)
Heavy-Duty Pile Driving Equipment with Advanced Cylinder Technology
US$370,000.00
1 Set(MOQ)
Tysim Kr300e Rotary Drilling Rig Construction Piling Equipment
US$647,000.00-684,000.00
1 Set(MOQ)
Heavy-Duty Piling Equipment with Eccentric Pile Driving Tool
US$100,000.00-1,000,000.00
1 Set(MOQ)
Mobile Drilling Rig, Borehole Drilling Machine Hydraulic Rotary Piling Equipment
US$87,000.00
1 Piece(MOQ)
Heavy-Duty Piling Equipment with Precision Driver for Excavator Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Tysim Kr110d/a Hydraulic Rotary Drilling Rig Piling Equipment
US$277,500.00-310,000.00
1 Set(MOQ)



















