Powered by Made-in-China.com
Heavy-Duty Side Grip Pile Driver for Compact Spaces
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Low Clearance Capability: Side grip design with dual clamping enables piling in minimal clearance spaces where top-drive hammers fail.
360-Degree Continuous Rotation: Full rotation allows precise pile positioning from any angle without moving the excavator, boosting efficiency.
Dual Clamping System: Side and bottom clamps securely grip piles during driving and extraction, removing need for extra handling equipment.
Versatile Pile Compatibility: Standard clamp seat interface fits multiple pile types, allowing quick changeovers.
ISO 9001:2015 Certified: Adheres to strict quality standards with high-strength materials and durable frame for minimal maintenance.
Custom Configuration Available: Tailored designs available for specific projects including color scheme and logo application.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, & Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme & logo application.
Q:How is the machine's quality and durability assured?
A:
We adhere to ISO 9001:2015. High-strength materials and durable frame ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force & adjustable frequency target compacted soils & mixed layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty Side Grip Pile Driver for Enhanced Efficiency
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Dual Clamping Side Grip Pile Driver for Excavators
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Compact Pile Driver for Confined Job Sites
US$300,000.00
1 Set(MOQ)
Durable Side Grip Pile Driver for Heavy-Duty Construction Needs
US$100,000.00-10,000,000.00
1 Set(MOQ)
High-Performance Sv-200 Side Grip Pile Driver for Tight Spaces
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Static Pile Driver for Concrete and Steel Tube Piling
US$261,000.00-270,000.00
1 Set(MOQ)
Heavy-Duty Juxiang Side Grip Pile Driver for 30-Ton Excavators
US$33,000.00-35,000.00
1 Piece(MOQ)
Heavy Duty Diesel Hydraulic Static Pile Driver Machine with Side Piling Mechanism
US$188,889.00
1 Set(MOQ)
OEM/ODM Excavator Spare Part Drilling Machine Heavy Duty Hydraulic Vibro Sheet Pile Driver for 20 Ton Excavator
US$14,000.00-18,000.00
1 Piece(MOQ)
Heavy Duty Side Clamp Pile Driver for Excavator Foundation and Retaining Walls
US$23,300.00
1 Piece(MOQ)
Powerful Eccentric Torque Pile Driver for Heavy-Duty Applications
US$13,500.00-14,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Press Pile Driver for Solar Installations
US$9,800.00-25,000.00
1 Piece(MOQ)
Heavy-Duty Excavator-Mounted Pile Driver for Road, Bridge & Port Construction
US$11,000.00-20,000.00
1 piece(MOQ)
Heavy-Duty Jzb60 Pile Driver for Efficient Ground Foundation Work
US$135,000.00-140,000.00
1 Piece(MOQ)
Hydraulic Pile Driver Side Grip Vibro Hammer for Steel Sheet Pile Driver Hammer 20-30ton Excavator
US$12,000.00-15,000.00
1 Piece(MOQ)
Advanced Hydraulic Side Grip Pile Driver for Sheet Piles
US$7,000.00-9,000.00
1 pieces(MOQ)
20 Ton Excavator Mounted Hydraulic Solar Pile Post Driver Vibro Hammer Side Grip Piling Machine Big Sheet Pile Driver for Fenders
US$10,000.00-15,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver for Efficient Fencing Solutions
US$9,800.00-25,000.00
1 Piece(MOQ)
Heavy-Duty SDLQ LQR-120 Hydraulic Pile Driver for Concrete
US$70,000.00-80,000.00
1 Piece(MOQ)



















