Powered by Made-in-China.com
Heavy-Duty Side Grip Pile Driver for Construction Projects
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-200Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
104kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
4.6 KgmCentrifugal Force
459 kNVibration Frequency
2300~3000 RpmSide Clamp Force
335kNBottom Clamp Force
385kNOperation Pressure
32 MPaWork Flow
170~230 L/MinWeight
2280 KgSuitable Excavator
20~25 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Low Clearance Operation: Dual clamping side grip design enables piling in minimal vertical spaces like tunnels and factories.
360-Degree Rotation: Full rotation allows precise pile positioning without repositioning the excavator.
Versatile Pile Compatibility: Drives and extracts steel sheet piles, H-beams, and pipes with quick change interface.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction without auxiliary cranes.
ISO 9001:2015 Certified: Manufactured with high-strength materials and durable frames for quality assurance.
Customizable Design: Color scheme and logo can be customized to match your fleet requirements.
Global 24/7 Support: Round-the-clock technical assistance and spare parts supply available worldwide.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Optimized logistics for Southeast Asia, India, Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo.
Q:How is the machine's quality and durability assured?
A:
We follow ISO 9001:2015. High-strength materials and a durable frame minimize maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency target compacted soils, mixed layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Versatile Drill Rig Static Pile Driver for Efficient Piling Operations Heavy Construction Equipment
US$261,000.00-270,000.00
1 Set(MOQ)
Heavy-Duty Eccentric Pile Driver Fv-700 for Construction Efficiency
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with 360° Rotating Grip for Construction
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Jzl60 Hydraulic Pile Driver for Efficient Construction Projects
US$155,000.00-160,000.00
1 Piece(MOQ)
Compact Side Grip Pile Driver for Tight Construction Spaces
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Static Pressure Pile Driver for Construction Efficiency
US$120,000.00-378,697.00
1 Set(MOQ)
Heavy-Duty Deep Foundation Driver for Excavators and Construction
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Zyc100b-B1 Static Pile Driver for Fast Construction
US$140,000.00-478,697.00
1 Set(MOQ)
Jzb60 Hydraulic Pile Driver for Heavy Duty Construction Projects
US$135,000.00-140,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Sheet Pile Driver for Excavation Projects
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Jzb60 Construction Pile Driver for Efficient Groundwork
US$135,000.00-140,000.00
1 Piece(MOQ)
Heavy-Duty 40 Ton Hydraulic Vibro Pile Driver for Efficient Construction
US$23,000.00-24,000.00
1 Piece(MOQ)
Jzl60 Pile Driver for Heavy Duty Construction Projects
US$155,000.00-160,000.00
1 Piece(MOQ)
Heavy-Duty Excavator-Mounted Pile Driver for Road, Bridge & Port Construction
US$11,000.00-20,000.00
1 piece(MOQ)
Durable Hydraulic Pile Driver for Heavy-Duty Construction Projects
US$14,500.00-15,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver for Efficient Foundation Construction
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Drop Hammer Pile Driver for Solar Projects
US$9,800.00-25,000.00
1 Piece(MOQ)
Heavy Duty Crawler Pile Driver for PV Panel Foundation
US$23,000.00-25,000.00
1 Piece(MOQ)
Heavy Duty Diesel Hammer Pile Driver for Construction Projects
US$36,000.00-66,000.00
1 Piece(MOQ)



















