Powered by Made-in-China.com
Heavy-Duty Side Grip Pile Driver for Enhanced Construction Efficiency
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-200Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
104kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
4.6 KgmCentrifugal Force
459 kNVibration Frequency
2300~3000 RpmSide Clamp Force
335kNBottom Clamp Force
385kNOperation Pressure
32 MPaWork Flow
170~230 L/MinWeight
2280 KgSuitable Excavator
20~25 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Low Clearance Capability: Side grip with dual clamps enables piling in minimal clearance areas like tunnels and under bridges.
360-Degree Rotation: Allows precise pile positioning from any angle, enhancing efficiency in tight sites.
Versatile Pile Compatibility: Adapts to sheet piles, H-beams, and pipe piles with quick swaps on the same machine base.
Self-Sufficient Operation: Handles clamping, positioning, driving, and extraction independently without auxiliary cranes.
ISO 9001:2015 Certified: Ensures high-strength materials and durable frame construction for low maintenance.
Customization Options: Color and logo customization available to match specific fleet requirements.
Global After-Sales Support: 24/7 technical assistance and spare parts supply with a 12-month standard warranty.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Optimized logistics for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color and logo.
Q:How is the machine's quality and durability assured?
A:
We follow ISO 9001:2015. High-strength materials and a durable frame ensure low maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency tackle compacted soils and layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Versatile Drill Rig Static Pile Driver for Efficient Piling Operations Heavy Construction Equipment
US$261,000.00-270,000.00
1 Set(MOQ)
Heavy-Duty Side Grip Pile Driver with Advanced Vibration Control
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy Duty Construction Concrete Hydraulic Pressure Pile Driver Machine for Piling
US$120,000.00-278,697.00
1 Set(MOQ)
Heavy-Duty Rotary Driver for Maximum Efficiency and Power
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Jzb120 Hydraulic Pile Driver for Construction Projects
US$175,000.00-180,000.00
1 Piece(MOQ)
Heavy Duty Crawler Pile Driver for PV Panel Foundation
US$23,000.00-25,000.00
1 Piece(MOQ)
Compact Hydraulic Pile Driver for Heavy H-Pile and Steel Tube Projects
US$261,000.00-270,000.00
1 Set(MOQ)
Powerful Jzl90 Construction Pile Driver for Heavy-Duty Projects
US$165,000.00-170,000.00
1 Piece(MOQ)
Robust Hydraulic Side Grip Pile Driver for Construction Machinery
US$100,000.00-10,000,000.00
1 Set(MOQ)
Jzl60 Pile Driver for Heavy Duty Construction
US$155,000.00-160,000.00
1 Piece(MOQ)
Efficient Side Grip Pile Driver for Heavy Excavation
US$100,000.00-10,000,000.00
1 Set(MOQ)
Powerful Jzb90 Pile Driver for Heavy-Duty Construction Projects
US$155,000.00-160,000.00
1 Piece(MOQ)
Heavy Duty Hydraulic Vibratory Pile Driver for Deep Foundation Construction Works
US$11,040.00
1 Piece(MOQ)
Robust Heavy-Duty Hammer Pile Driver for Construction Projects
US$10,000.00-12,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver for Efficient Foundation Construction
US$22,000.00-23,000.00
1 Piece(MOQ)
High Efficiency Hydraulic Pile Driver with Side Grip for 25 Ton Excavator
US$22,000.00
1 Piece(MOQ)
Heavy-Duty Excavator Vibro Pile Driver for Construction Projects
US$7,000.00-9,000.00
1 pieces(MOQ)
Heavy-Duty Excavation Pile Driver for Ultimate Groundwork Efficiency
US$34,500.00-35,000.00
1 Piece(MOQ)
Henan Zhonhon Factory Direct Diesel Powered Guardrail Pile Driver Machine for Heavy Duty Piling
US$2,999.00-3,299.00
1 Piece(MOQ)



















