Powered by Made-in-China.com
Heavy-Duty Side Grip Pile Driver for Superior Construction Efficiency
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Low Clearance Capability: Side grip design with dual clamping allows piling in minimal clearance spaces.
360-Degree Continuous Rotation: Full rotation enables precise pile positioning from any angle for enhanced efficiency.
Dual Clamping System: Side and bottom clamps securely grip piles without needing extra equipment.
Versatile Pile Compatibility: Fits multiple pile types including sheet piles, H-beams, and pipes with quick changeovers.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction independently without cranes.
ISO 9001:2015 Certified: Quality and durability assured through high-strength materials and compliance.
1 Year Warranty Coverage: Includes 12 months standard warranty with 24/7 global technical support and parts supply.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Includes color and logo customization.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 compliant. High-strength materials ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force, adjustable frequency target compacted soils and layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Versatile Drill Rig Static Pile Driver for Efficient Piling Operations Heavy Construction Equipment
US$261,000.00-270,000.00
1 Set(MOQ)
Heavy-Duty Eccentric Pile Driver Fv-900 for Construction Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Reliable Hydraulic Pile Driver for Small Projects and Heavy Piling Needs
US$261,000.00-270,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Side Grip Pile Driver for Foundations
US$100,000.00-10,000,000.00
1 Set(MOQ)
Quiet Silent Pile Driver for Versatile Heavy-Duty Rig Applications
US$120,000.00-275,896.00
1 Set(MOQ)
Heavy Duty Hydraulic Vibratory Pile Driver for Deep Foundation Construction Works
US$11,040.00
1 Piece(MOQ)
Robust Heavy-Duty Hammer Pile Driver for Construction Projects
US$10,000.00-12,000.00
1 Piece(MOQ)
Heavy-Duty Deep Foundation Driver for Excavators and Construction
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Vibratory Pile Driver for Construction Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Jzb240 Walking Pile Driver for Heavy Duty Construction
US$333,300.00-333,333.00
1 Set(MOQ)
Heavy-Duty Jzl90 Construction Pile Driver for Efficient Groundwork
US$165,000.00-170,000.00
1 Piece(MOQ)
Heavy Duty 30 Ton Excvator Hydraulic Tilt Pile Driver for Construction Projects
US$14,500.00
1 Piece(MOQ)
Heavy-Duty Jzb60 Construction Pile Driver for Efficient Groundwork
US$135,000.00-140,000.00
1 Piece(MOQ)
Heavy-Duty Jzb120 Hydraulic Pile Driver for Construction Projects
US$175,000.00-180,000.00
1 Piece(MOQ)
Powerful Heavy-Duty Vibro Pile Driver for Construction Needs
US$11,500.00-13,000.00
1 Piece(MOQ)
Juxiang Heavy-Duty Excavator Vibro Pile Driver for Efficient Construction
US$23,000.00-24,000.00
1 Piece(MOQ)
High Efficiency Hydraulic Pile Driver with Side Grip for 25 Ton Excavator
US$22,000.00
1 Piece(MOQ)
Heavy Duty Side Clamp Pile Driver for Excavator Foundation and Retaining Walls
US$23,300.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver for Large-Scale Construction Projects
US$34,500.00-35,000.00
1 Piece(MOQ)



















