Powered by Made-in-China.com
Heavy-Duty Sv-300 Pile Driver for 25-32 Ton Excavators
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Low Clearance Capability: Unique side grip design enables piling in spaces with minimal vertical clearance.
360-Degree Continuous Rotation: Allows precise pile positioning from any angle without repositioning the excavator.
Dual Clamping System: Side and bottom clamps work together to securely grip piles during driving and extraction.
Versatile Pile Compatibility: Accommodates steel sheet piles, H-beams, and pipe piles with quick changeovers.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction without auxiliary equipment.
ISO 9001:2015 Certified: High-strength materials and durable frame ensure quality and minimal maintenance.
Global 24/7 Support: Round-the-clock technical assistance and spare parts supply available worldwide.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
We adhere to ISO 9001:2015. High-strength materials and a durable frame ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency effectively target compacted soils and mixed layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Versatile 360° Pile Driver for 23-27 Ton Excavators Fv-280r
US$17,700.00-21,250.00
1 Set(MOQ)
Heavy-Duty Eccentric Pile Driver for 50-65 Ton Excavators
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Vibro Pile Driver for 20 Ton Excavators
US$14,000.00-14,500.00
1 Piece(MOQ)
High-Performance 772 kN Sv-500 Pile Driver for Heavy Duty Construction
US$100,000.00-10,000,000.00
1 Set(MOQ)
High-Efficiency 360° Hydraulic Pile Driver for 23-27 Ton Excavators
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Crane-Mounted Pile Driver with 8 Ton Capacity
US$278,600.00-279,000.00
1 Set(MOQ)
Heavy-Duty Zyc100b-B1 Hydraulic Pile Driver for Construction Projects
US$140,000.00-478,697.00
1 Set(MOQ)
Professional Hydraulic Vibro Pile Driver for Heavy Duty Excavator Mounted Operations
US$11,040.00
1 Piece(MOQ)
Heavy-Duty 90-Ton Pile Driver Zyc100b for Industrial Applications
US$130,000.00
1 Set(MOQ)
Advanced Automated Concrete Pile Driver for Heavy-Duty Rig Applications
US$300,000.00
1 Set(MOQ)
Factory Price Hydraulic Pile Driver Attachment for 18-25 Ton Excavator
US$14,500.00
1 Piece(MOQ)
Gpy868 Heavy-Duty Static Pile Driver for Deep Foundations
US$600,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver for 20 Ton Excavators
US$14,000.00-14,500.00
1 Piece(MOQ)
Heavy Duty Side Clamp Pile Driver for Excavator Foundation and Retaining Walls
US$23,300.00
1 Piece(MOQ)
Hydraulic Pile Driver Strength Factory Manufacturing for 18-25 Ton Excavator
US$12,000.00-15,000.00
1 Piece(MOQ)
Heavy Duty 30 Ton Excvator Hydraulic Tilt Pile Driver for Construction Projects
US$14,500.00
1 Piece(MOQ)
Heavy-Duty 20 Ton Excavator Vibrating Pile Driver Equipment
US$4,990.00
1 sets(MOQ)
Heavy-Duty High-Frequency Pile Driver for Urban Construction Needs
US$12,000.00-12,500.00
1 Piece(MOQ)
Heavy Duty Horizontal Excavator Pile Driver for Low Clearance Working Conditions
US$23,300.00
1 Piece(MOQ)
High Efficiency Hydraulic Pile Driver with Side Grip for 25 Ton Excavator
US$22,000.00
1 Piece(MOQ)



















