Powered by Made-in-China.com
Durable Sv-400 Pile Driver Designed for 32-40 Ton Excavators
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170,7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Low Clearance Capability: Unique side grip design enables piling in spaces with minimal vertical clearance.
360-Degree Continuous Rotation: Allows precise pile positioning from any angle without repositioning the excavator.
Dual Clamping System: Side and bottom clamps work together to securely grip piles during driving and extraction.
Versatile Pile Compatibility: Accommodates steel sheet piles, H-beams, and circular pipe piles with quick changeovers.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction without requiring cranes.
ISO 9001:2015 Certified: Adheres to strict quality standards with high-strength materials and durable frame.
1-Year Warranty Coverage: Covers mechanical defects with 24/7 technical assistance and spare parts supply.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
We adhere to ISO 9001:2015. High-strength materials and a durable frame ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency effectively target compacted soils and mixed layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Versatile 360° Pile Driver for 23-27 Ton Excavators Fv-280r
US$17,700.00-21,250.00
1 Set(MOQ)
Juxiang 40 Tons Excavator Hydraulic Pile Driver for Pipe Piles
US$23,000.00-24,000.00
1 Piece(MOQ)
High-Performance Hydraulic Pile Driver for Excavators 25-32 Tons
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Sv-400 Side Grip Pile Driver for Tough Jobs
US$100,000.00-10,000,000.00
1 Set(MOQ)
Juxiang Side Grip Hydraulic Pile Driver Designed for 30 Tons Excavators
US$33,000.00-35,000.00
1 Piece(MOQ)
Heavy-Duty Fv-250r High-Flow Hydraulic 360° Pile Driver Designed for 20-25 Ton Excavators
US$100,000.00-1,000,000.00
1 Set(MOQ)
Durable 20 Ton Hydraulic Vibratory Pile Driver for Heavy Construction
US$14,000.00-15,000.00
1 Piece(MOQ)
High-Performance GF350 Solar Pile Driver for 20-Ton Excavators
US$14,000.00-14,500.00
1 Piece(MOQ)
Excavator Pile Driver for 1-70 Ton Excavator
US$12,000.00-15,000.00
1 Piece(MOQ)
OEM/ODM Excavator Spare Part Drilling Machine Heavy Duty Hydraulic Vibro Sheet Pile Driver for 20 Ton Excavator
US$14,000.00-18,000.00
1 Piece(MOQ)
China Excavator Pile Driver Hammer Post Driver for 7-14 Ton
US$1,400.00-1,500.00
5 Pieces(MOQ)
30 Ton Excavator Attachment Vibratory Pile Driver for Steel Sheet Pile / H Beam with Side Grip
US$8,999.00-18,000.00
1 Piece(MOQ)
Durable Silent Pile Driver for Phc Tubes - T-Works Zyc 600b-B1
US$200,000.00
1 Set(MOQ)
Durable Hydraulic Vibratory Pile Driver for Industrial Site Foundation Laying
US$8,000.00-16,500.00
1 Set(MOQ)
New 30 Tons-40 Tons Excavator/Digger Hydraulic Vibratory Pile Driver Core Motor Component Construction Parts
US$1,000.00-3,000.00
1 sets(MOQ)
Excavator Vibratory Pile Driver for Infrastructure Projects with Strong Impact Energy
US$11,000.00-20,000.00
1 Set(MOQ)
Excavator Mounted Vibratory Silent Pile Driver Press for Urban Construction
US$11,000.00-20,000.00
1 Set(MOQ)
Multi-Functional Excavator Mounted Pile Driver for Compact Construction Sites
US$9,200.00-10,000.00
1 Piece(MOQ)
Dlk Hydraulic Vibratory Pile Driver for 24-32 Tons Excavator
US$2,500.00
1 Piece(MOQ)
Silent and Vibratory Hydraulic Excavator Pile Driver for Construction
US$11,000.00-20,000.00
1 Set(MOQ)



















