Powered by Made-in-China.com
High Efficiency 360° Hydraulic Pile Driver with Enhanced Grip
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-200Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
104kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
4.6 KgmCentrifugal Force
459 kNVibration Frequency
2300~3000 RpmSide Clamp Force
335kNBottom Clamp Force
385kNOperation Pressure
32 MPaWork Flow
170~230 L/MinWeight
2280 KgSuitable Excavator
20~25 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
360-Degree Continuous Rotation: Allows precise pile positioning from any angle without repositioning the excavator.
Low Clearance Capability: Unique side grip design enables piling in spaces with minimal vertical clearance.
Dual Clamping System: Side and bottom clamps work together to securely grip piles without extra equipment.
Versatile Pile Compatibility: Accommodates steel sheet piles, H-beams, and circular pipe piles with quick changeovers.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction independently without cranes.
1-Year Warranty Coverage: Covers mechanical defects with free parts and labor for one year.
ISO 9001:2015 Certified: Manufactured with high-strength materials and durable frames for minimal maintenance.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
We adhere to ISO 9001:2015. High-strength materials and a durable frame ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency effectively target compacted soils and mixed layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Hydraulic Side Grip Pile Driver Sv-200 for Sheet Pile & H-Beam 360° Rotation Low Noise Piling Equipment
US$100,000.00-10,000,000.00
1 Set(MOQ)
High-Capacity Fv-250r 32MPa Pressure-Resistant Rotary Joint 360° Pile Driver with 12-Month Warranty
US$100,000.00-1,000,000.00
1 Set(MOQ)
High - Performance Hydraulic Static Pile Driver with Counterweight Design Heavy Construction Machinery
US$120,000.00-278,000.00
1 Set(MOQ)
Handheld High-Efficiency Variable-Flow Hydraulic Pile Driver
US$1,300.00-1,600.00
5 Pieces(MOQ)
High-Efficiency Low-Clearance Side Grip Pile Driver for Factories
US$100,000.00-10,000,000.00
1 Set(MOQ)
High Efficiency Vibro Hammer with Eccentric Pile Driver Technology
US$100,000.00-1,000,000.00
1 Set(MOQ)
High-Performance Hydraulic Pile Driver with Advanced 6-Cylinder Engine
US$300,000.00
1 Set(MOQ)
High Efficiency Excavator Hydraulic Vibratory Pile Driver
US$10,000.00
1 Piece(MOQ)
Durable T-Works Zyc Hydraulic Pile Driver with High Strength
US$100,000.00-278,697.00
1 Set(MOQ)
High-Efficiency Hydraulic Static Pile Driver with ISO Certification
US$120,000.00
1 Set(MOQ)
High Efficiency Hydraulic Pile Driver for Slope Stabilization
US$22,000.00-23,000.00
1 Piece(MOQ)
High Efficiency Hydraulic Pile Driver with Side Grip for 25 Ton Excavator
US$22,000.00
1 Piece(MOQ)
High-Efficiency Solar Pile Driver with 6m Frame Post Crawler Ramming Machine
US$10,000.00-300,000.00
1 Piece(MOQ)
Goodeng GPY468 Hydraulic Static Pile Driver with High Efficiency
US$300,000.00-500,000.00
1 Piece(MOQ)
High-Efficiency Hydraulic Pile Driver with Photovoltaic Cement Vibration Hammer New Condition Motor as Core Component
US$1,000.00-3,000.00
1 sets(MOQ)
High Working Efficiency Hydraulic Solar Farm Pile Driver Ramming Photovoltaic Piles
US$32,000.00-38,000.00
1 Set(MOQ)
High Efficiency Hydraulic Excavator with Advanced Pile Driver
US$12,000.00-15,000.00
1 Piece(MOQ)
High-Performance Hydraulic Pile Driver with Adjustable Vibration Settings
US$12,000.00-12,500.00
1 Piece(MOQ)



















