Powered by Made-in-China.com
High-Efficiency Low Clearance Pile Driver for Heavy-Duty Projects
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Low Clearance Design: Enables piling in limited headroom areas like inside buildings and under bridges.
360-Degree Rotation: Allows precise pile positioning from any angle for improved efficiency.
Dual Clamping System: Side and bottom clamps securely grip piles eliminating extra handling equipment.
Versatile Pile Compatibility: Drives and extracts steel sheet, H-beams, and pipe piles with quick changeovers.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction without cranes or support.
ISO 9001:2015 Certified: Quality assured through strict adherence to international standards.
Customization Options: Custom colors, logos, and designs available upon request.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time?
A:
Lead time is 15-35 days. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine match our fleet?
A:
Yes. Customization includes colors and logo.
Q:How is the machine's quality assured?
A:
We follow ISO 9001:2015. Durable materials ensure low maintenance.
Q:Is the machine suitable for hard soil?
A:
Yes. High force and adjustable frequency handle compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Versatile Drill Rig Static Pile Driver for Efficient Piling Operations Heavy Construction Equipment
US$261,000.00-270,000.00
1 Set(MOQ)
Heavy-Duty 600t Concrete Pile Driver Machine for Efficient Construction
US$100,000.00-378,697.00
1 Set(MOQ)
Heavy-Duty Hydraulic Vibratory Pile Driver for Construction Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Versatile 4200kN to 10200kN Pile Driver for Heavy Projects3.
US$120,000.00-278,697.00
1 Set(MOQ)
Heavy-Duty Extended Arm Hydraulic Pile Driver for Construction
US$150,000.00-178,697.00
1 Set(MOQ)
Durable Hydraulic Pile Driver for Heavy-Duty Construction Projects
US$14,500.00-15,000.00
1 Piece(MOQ)
High-Efficiency Hydraulic Pile Driver Fv-150r for Construction Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Side Grip Pile Driver for Enhanced Efficiency
US$100,000.00-10,000,000.00
1 Set(MOQ)
OEM/ODM Excavator Spare Part Drilling Machine Heavy Duty Hydraulic Vibro Sheet Pile Driver for 20 Ton Excavator
US$14,000.00-18,000.00
1 Piece(MOQ)
Heavy-Duty Fv-250r High-Flow Hydraulic 360° Pile Driver Designed for 20-25 Ton Excavators
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver for Solar Projects
US$20,999.00-24,999.00
1 Piece(MOQ)
Heavy-Duty Excavator Hydraulic Pile Driver Hammer for Sheet Piling Construction Projects
US$23,000.00-24,000.00
1 Piece(MOQ)
Jzl60 Pile Driver for Heavy Duty Construction Projects
US$155,000.00-160,000.00
1 Piece(MOQ)
Heavy-Duty Crawler Solar Pile Driver for PV Projects
US$9,800.00-25,000.00
1 Piece(MOQ)
High Efficiency and High-Tech Pile Driver for Solar Projects
US$19,900.00-22,999.00
1 Piece(MOQ)
Powerful Jzb90 Pile Driver for Heavy-Duty Construction Projects
US$155,000.00-160,000.00
1 Piece(MOQ)
High-Efficiency Diesel Hammer Pile Driver for Heavy-Duty Construction Needs
US$36,000.00-66,000.00
1 Piece(MOQ)
High-Efficiency Solar Pile Driver for Sustainable Construction Projects
US$22,000.00-26,000.00
1 Piece(MOQ)
Heavy-Duty Jzb120 Hydraulic Pile Driver for Construction Projects
US$175,000.00-180,000.00
1 Piece(MOQ)
Hot Selling High Efficiency and Good Quality Pile Driver for Solar Projects
US$19,900.00-22,999.00
1 Piece(MOQ)



















