Powered by Made-in-China.com
High Performance Side Grip Pile Driver with Vibration Control
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
360-Degree Continuous Rotation: Allows precise positioning from any angle without repositioning the excavator.
Dual Clamping System: Side and bottom clamps securely grip piles, eliminating need for extra handling equipment.
Low Clearance Capability: Enables piling in minimal clearance spaces where top-drive hammers cannot work.
Versatile Pile Compatibility: Accommodates steel sheets, H-beams, and pipes with quick changeovers.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction independently without cranes.
ISO 9001:2015 Certified: Adherence to international quality standards ensures high durability.
1-Year Comprehensive Warranty: Covers mechanical defects with 24/7 global technical support and parts supply.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Optimized logistics for Asia, India, Russia.
Q:Can the machine match our fleet?
A:
Yes. Customization includes color and logo.
Q:How is machine's quality assured?
A:
ISO 9001:2015 adherence. High-strength materials ensure durability.
Q:Is it suitable for hard soil in our area?
A:
Yes. High centrifugal force and frequency target compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
High Performance Hydraulic Side Grip Pile Driver for Sheet Piles
US$100,000.00-10,000,000.00
1 Set(MOQ)
High-Frequency Sv-300 Side Grip Pile Driver for Efficient Construction
US$100,000.00-10,000,000.00
1 Set(MOQ)
High-Performance Hydraulic Pile Driver with Intelligent Control Features
US$300,000.00
1 Set(MOQ)
Versatile Sv-300 Side Grip Pile Driver with 360° Rotation
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Side Grip Pile Driver for Superior Vibration Control
US$100,000.00-10,000,000.00
1 Set(MOQ)
Advanced Zyc600 Urban Pile Driver with Enhanced Vibration Control
US$300,000.00
1 Set(MOQ)
High-Performance Hydraulic Pile Driver with Adjustable Vibration Settings
US$12,000.00-12,500.00
1 Piece(MOQ)
High-Performance Hydraulic Static Pile Driver with Vibration Control
US$150,000.00-178,697.00
1 Set(MOQ)
High-Performance 30 Ton Hydraulic Pile Driver with Side Clamp
US$33,000.00-35,000.00
1 Piece(MOQ)
High-Performance Hydraulic Static Pile Driver with Firm Grip
US$150,000.00-278,697.00
1 Set(MOQ)
High Efficiency Hydraulic Pile Driver with Side Grip for 25 Ton Excavator
US$22,000.00
1 Piece(MOQ)
High-Performance Hydraulic Excavator Driver with Vibro Hammer Attachment
US$28,499.00-30,499.00
1 Piece(MOQ)
Excavator Vibro Pile Driver with Side Grip Clamp
US$25,000.00
1 Piece(MOQ)
Hydraulic Side Grip Pile Driver for Excavators with Vibratory Driving Function
US$23,300.00
1 Piece(MOQ)
Hydraulic Pile Driver Attachment for 20 Ton Excavator with Side Grip
US$22,000.00
1 Piece(MOQ)
High-Performance Solar Pile Driver with 6m Crawler Frame
US$9,800.00-25,000.00
1 Piece(MOQ)
High-Performance Solar Ground Screw Pile Driver with Corrosion-Resistant Hydraulic System
US$10,000.00-39,800.00
1 Set(MOQ)
High Performance Excavator Mounted Pile Driver with Superior Hydraulic Clamp
US$12,600.00-19,500.00
1 Piece(MOQ)
Hx Factory Sale 5m Photovoltaic Solar Crawler Pile Driver Machine with High Performance
US$19,999.00-23,999.00
1 Piece(MOQ)



















