Powered by Made-in-China.com
High-Performance Vibro Hammer for Fast Pile Driving Solutions
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Low Clearance Capability: Side grip design with dual clamping allows piling in minimal vertical clearance areas.
360-Degree Continuous Rotation: Full rotation allows precise pile positioning from any angle for improved efficiency.
Dual Clamping System: Side and bottom clamps securely grip piles, eliminating extra handling equipment.
Versatile Pile Compatibility: Accommodates steel sheets, H-beams, and pipes with quick changeovers.
Self-Sufficient Operation: Completes piling independently without needing cranes or auxiliary support.
ISO 9001:2015 Certified: Ensures high quality and durability with durable materials for minimal maintenance.
Custom Configurations Available: Customization includes color scheme, logo, and specific project design needs.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 compliance. Durable materials for minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency for compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Electric Vibro Hammer for High-Performance Pile Driving
US$62,900.00-83,900.00
1 Piece(MOQ)
Dynamic Electric Vibro Hammer for High-Performance Foundation Applications
US$62,900.00-83,900.00
1 Piece(MOQ)
High-Performance Hydraulic Hammer for Heavy-Duty Pile Driving Solutions
US$100,000.00-10,000,000.00
1 Set(MOQ)
High-Performance Hydraulic Photovoltaic Vibro Hammer RV-400 for Solar Pile Driving
US$12,500.00-13,000.00
1 Piece(MOQ)
High-Performance Excavator Vibro Hammer for Quick Piling Solutions
US$20,000.00
1 Piece(MOQ)
High-Performance Excavator Photovoltaic Vibro Hammer for Concrete Pile Driving
US$14,000.00-14,500.00
1 Piece(MOQ)
High-Performance Zss500 Hydraulic Vibro Hammer for Piling Applications
US$10,000.00
1 Piece(MOQ)
Realtop Rt-150A 150kw Electric Vibro Pile Hammer for Construction Projects Requiring Fast Pile Driving Speed
US$62,900.00-83,900.00
1 Piece(MOQ)
High-Performance S500 Hydraulic Vibro Hammer for Piling Applications
US$10,000.00
1 Piece(MOQ)
High-Performance Electric Vibro Hammer for Foundation Improvement Needs
US$62,900.00-83,900.00
1 Piece(MOQ)
High-Tech Vibro Hammer Pile Driver New Condition with Long-Lasting Motor Includes Engine Pump Crane for Driving Pipe
US$9,400.00-10,000.00
1 Piece(MOQ)
Advanced Tilting Vibro Hammer for Pile Driving Construction Performance
US$22,000.00-23,000.00
1 Piece(MOQ)
Powerful Hydraulic Hammer for Fast Pile Driving Solutions
US$100,000.00-10,000,000.00
1 Set(MOQ)
High-Performance Hydraulic Vibro Pile Hammer for Efficient Construction
US$38,000.00-41,000.00
1 Piece(MOQ)
High Frequency Hydraulic Vibrohammer Vibro Hammer Pile Driver Hydraulic Vibro Pile Hammer for Solar
US$9,400.00-10,000.00
1 Piece(MOQ)
High-Tech Vibro Hammer Pile Driver with Long-Lasting Motor Pump Crane Including Driving Pipe and Mini Excavator Pile Driver
US$9,400.00-10,000.00
1 Piece(MOQ)
Powerful Vibro Hammer for Excavators - Eccentric Moment Design
US$100,000.00-1,000,000.00
1 Set(MOQ)
Excavator Mounted Hydraulic Sheet Pile Driver Vibro Hammer for Concrete Piles
US$12,480.00
1 Set(MOQ)


















