Powered by Made-in-China.com
Hydraulic Piling Equipment: Heavy-Duty Driver with Superior Construction Power
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps grip piles during driving and extraction without auxiliary equipment.
360-Degree Rotation: Full rotation enables precise pile positioning from any angle without repositioning the excavator.
Versatile Pile Compatibility: Accommodates steel sheets, H-beams, and pipes with quick-change clamp seats.
Low Clearance Capability: Designed for limited headroom sites like factories, under bridges, and tunnels.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction independently without cranes.
ISO 9001:2015 Certified: High-strength materials and certified quality ensure minimal maintenance and durability.
Customizable Color and Logo: Machine customization includes specific color and logo options to match your fleet.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time?
A:
Lead time is 15-35 days ex-works. Logistics are optimized for Asia, India, and Russia.
Q:Can the machine match our fleet?
A:
Yes. Customization includes color and logo.
Q:What is the quality and durability of the machine?
A:
ISO 9001:2015 certified. High-strength materials ensure minimal maintenance.
Q:Is the machine suitable for hard soil conditions?
A:
Yes. High force and adjustable frequency target compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Versatile Drill Rig Static Pile Driver for Efficient Piling Operations Heavy Construction Equipment
US$261,000.00-270,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver for Reliable Construction Applications
US$100,000.00-1,000,000.00
1 Set(MOQ)
Powerful Hydraulic Pile Driver for Heavy-Duty Construction Machinery
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with 8t Lifting Power
US$300,000.00
1 Set(MOQ)
Heavy-Duty 360° Vibratory Pile Driver for Construction Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Fv-300r 360° Vibratory Pile Driver for Construction
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with Enhanced Capacity Design
US$150,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with CE Certification for Global Construction
US$120,000.00
1 Set(MOQ)
Goodeng GPY228 Hydraulic Static Pile Driver Heavy-Duty Pile Driving Construction Equipment
US$150,000.00-250,000.00
1 Piece(MOQ)
Heavy-Duty Jzl120 Pile Driver with Hydraulic Power
US$175,000.00-180,000.00
1 Piece(MOQ)
Heavy-Duty 40 Ton Hydraulic Vibro Pile Driver for Efficient Construction
US$23,000.00-24,000.00
1 Piece(MOQ)
Hydraulic Pile Driver Machine for Construction 10ton Vibratory Hammer Piling Equipment
US$6,500.00-7,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver for Long-Lasting Construction Solutions
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Photovoltaic Pile Driver with Robust Steel Frame Structure
US$15,000.00-16,000.00
1 Piece(MOQ)
Heavy Duty 1 Year Warranty Hydraulic Pile Driver for 500-1600mm Drilling with ISO 9001: 2000
US$50,000.00-55,000.00
1 Set(MOQ)
Durable Hydraulic Pile Driver for Heavy-Duty Construction Projects
US$14,500.00-15,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver with Advanced Vibro Hammer Technology
US$12,000.00-12,500.00
1 Piece(MOQ)
SDLQ LG-4 Heavy-Duty Solar Piling Equipment pile driver solar pile machine
US$22,000.00-26,000.00
1 Piece(MOQ)



















