SourcingAI
Try for free
Powered by Made-in-China.com
Innovative Hydraulic Hammer: 505 kN for Effective Foundation Work
US$100,000.00-1,000,000.00
1 Set

Product profile

After-sales Service

Technical Supports

Warranty

1 Year

Type

Vibration Piling Machine

Model NO.

FV-350S

Pressure Pile Driver Type

Hydraulic Pile Driver

Pile Hammer Type

Hydraulic Hammer

Power Source

Hydraulic System

Motor Power

134.4kw

Noise

With Noise

Certification

ISO 9001:2015

Condition

New

Vibration Frequency

3200 Rpm

Centrifugal Force

505 kN

Eccentric Moment

7.4 Kgm

Operation Pressure

32 MPa

Work Flow

240~320 L/Min

Max.Pile Length

12m

Suitable Excavator

36~40 T

Transport Package

Wooden Box

Trademark

VIBRA

Origin

Shanghai China

HS Code

8430100000

Production Capacity

20 Set/Month

Key features

Custom Solar Design: Exclusively designed for solar farm piling in the photovoltaic industry.
High Vibration Power: Offers 505kN centrifugal force for superior efficiency over traditional drivers.
Compact Lightweight: Compact structure allows flexibility and operation in tight spaces.
Global Components: Features renowned hydraulic motors and German bearings for reliability.
Cost-Effective: Reduces machinery investment and daily operational costs for contractors.
Proven Performance: Validated across projects with stable quality in various soil conditions.
ISO 9001 Certified: Compliant with ISO 9001:2015 standards ensuring high quality and durability.

Company profile

SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
Importers and ExportersYears of Export ExperienceCustomization from DesignsR&D Capabilities
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T

About Our Factory & Business Background

AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92

Our Production Capability & Technical Expertise

Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics for SE Asia, India, Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 compliance. Durable materials ensure minimal maintenance.
Q:Is it suitable for hard soil conditions in our area?
A:
Yes. High force and adjustable frequency for compacted soils.

Send Inquiry

*To:SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Heavy-Duty Hydraulic Side Grip Hammer for Foundation Work
Made-in-China.com
Hydraulic Hammer with Compact Structure for Foundation Work
Made-in-China.com
Vibro Pile Hammer for Ground Foundation Work

Vibro Pile Hammer for Ground Foundation Work

US$11,500.00-12,800.00
1 Set(MOQ)
Made-in-China.com
Hydraulic Vibrator Pile Hammer for Construction Foundation
Made-in-China.com
Efficient Hydraulic Vibro Hammer for Reliable Foundation Work
Made-in-China.com