Powered by Made-in-China.com
Innovative Hydraulic Vibratory Pile Driver for Efficient Operations
US$100,000.00-1,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
FV-800Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
231.0kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewVibration Frequency
2800 RpmCentrifugal Force
997 kNEccentric Moment
14.5kgmOperation Pressure
32 MPaWork Flow
420 L/MinMax.Pile Length
27mSuitable Excavator
75~85tTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Superior Vibration Power: Equipped with Parker motors and German bearings delivering up to 1064 kN force.
High-Clamping Cast Steel Gripper: Strong jaws with 160-180 oil cylinders provide up to 650 kN clamping force.
Intelligent Electronic Control: New system optimizes performance, extends life, and enhances safety.
ISO 9001:2015 Certified: Manufactured under strict international quality standards for reliability.
Global 24/7 Support: Round-the-clock technical support and spare parts availability worldwide.
12-Month Warranty: Comprehensive coverage for all mechanical defects for one year.
Customizable Options: Available in various colors and logos to match specific requirements.
Versatile Applications: Ideal for bridges, ports, offshore platforms, and urban infrastructure.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the delivery lead time to our region?
A:
Lead time: 15-35 days ex-works. Optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Custom options include color and logo.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 standards. High-strength materials ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency target compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Versatile Drill Rig Static Pile Driver for Efficient Piling Operations Heavy Construction Equipment
US$261,000.00-270,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver for Efficient Excavation Projects
US$12,500.00-13,000.00
1 Piece(MOQ)
Innovative Vibration-Free Pile Driver for Efficient Construction Projects
US$200,000.00
1 Set(MOQ)
Durable Excavator Hydraulic Pile Driver for Efficient Construction
US$10,000.00-12,000.00
1 Piece(MOQ)
Advanced Frictionless Hydraulic Driver for Efficient Piling Operations
US$100,000.00-1,000,000.00
1 Set(MOQ)
Powerful Vibratory Sheet Pile Driver for Efficient Construction Projects
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy Duty 30 Ton Hydraulic Pile Driver for Efficient Sheet Piling
US$22,000.00-23,000.00
1 Piece(MOQ)
Versatile Vibratory Pile Driver for Efficient Foundation Installation
US$28,499.00-30,499.00
1 Piece(MOQ)
Reliable Hydraulic Vibratory Pile Driver for Efficient Construction Work
US$100,000.00-1,000,000.00
1 Set(MOQ)
Compact Pile Driver for Efficient Heavy-Duty Excavator Operations
US$100,000.00-1,000,000.00
1 Set(MOQ)
Electric Hydraulic Crawler Pile Driver for Efficient Pile Driving
US$180,000.00-185,000.00
1 set(MOQ)
Precision Driver for Efficient Deep Foundation Piling Operations
US$100,000.00-1,000,000.00
1 Set(MOQ)
Compact SDLQ LQR-80 Vibratory Pile Driver for Efficient Drilling
US$70,000.00-80,000.00
1 Piece(MOQ)
Advanced Hydraulic Pile Driver Zyc100b-B for Efficient Construction
US$130,000.00
1 Set(MOQ)
High-Performance Zyc120b-B Hydraulic Pile Driver for Efficient Construction
US$150,000.00-278,000.00
1 Set(MOQ)
Silent and Vibratory Hydraulic Excavator Pile Driver for Construction
US$11,000.00-20,000.00
1 Set(MOQ)
Yz-230vm Model Hydraulic Vibratory Hammer Large Piling Driver for Pipe Pile
US$100,000.00-1,000,000.00
1 Piece(MOQ)
OEM/ODM Excavator Attachment Piling Machine Hydraulic Vibro Static Pile Driver Vibratory Pile Driver for Excavator
US$8,500.00-22,666.00
1 Piece(MOQ)
Energy Saving Efficient Hydraulic Solar Pile Driver Machine for General Daily Use
US$23,000.00-25,000.00
1 Piece(MOQ)



















