Powered by Made-in-China.com
Low Clearance Eccentric Vibro Hammer for Efficient Pile Driving
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Low Clearance Capability: Unique side grip enables operations in minimal vertical clearance where top-drive hammers cannot work.
360-Degree Continuous Rotation: Full rotation allows precise pile positioning from any angle, enhancing piling efficiency.
Dual Clamping System: Side and bottom clamps securely grip piles during driving and extraction, eliminating extra handling equipment.
Versatile Pile Compatibility: Replaceable clamp seat interface accommodates multiple pile types with quick changeovers.
1-Year Warranty Coverage: Covers mechanical defects with 24/7 technical assistance and spare parts support globally.
Customizable Color and Logo: Customization options available for machine color and logo to match your fleet branding.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time?
A:
15-35 days ex-works. Logistics for SE Asia, India, Russia.
Q:Can the machine match our fleet?
A:
Yes. Customization includes color and logo.
Q:How's the machine's quality assured?
A:
ISO 9001:2015 compliance. High-strength materials for minimal maintenance.
Q:Suitable for hard soil conditions?
A:
Yes. High force and adjustable frequency for compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Korea Hydraulic Vibro Hammer for Efficient Sheet Pile Driving
US$14,000.00-14,500.00
1 Piece(MOQ)
Advanced Vibro Hammer for Efficient Low Clearance Piling Solutions
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Cat324 Excavator Vibro Hammer for Efficient Pile Driving
US$22,000.00-23,000.00
1 Piece(MOQ)
Durable Vibro Hammer for Precision Low Clearance Foundation Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
Advanced Low Clearance Hydraulic Vibro Hammer for Piling Efficiency
US$100,000.00-10,000,000.00
1 Set(MOQ)
Efficient 30kw Vibro Hammer for Reliable Pile Driving Operations
US$18,800.00-20,000.00
1 Set/Sets(MOQ)
Efficient for Cat320 8-12m Pile Driving Machine Side Clamp Vibro Hammer
US$23,400.00
1 Piece(MOQ)
Premium Vibro Hammer for Efficient Pile Driving Solutions
US$20,000.00-22,000.00
1 Piece(MOQ)
High-Efficiency Low Clearance Vibro Hammer for Quick Installations
US$100,000.00-10,000,000.00
1 Set(MOQ)
Reliable Electric Pile Hammer for Efficient Pile Driving in Normal Soil
US$57,000.00-60,000.00
1 Set/Sets(MOQ)
High-Tech Vibro Hammer with Long-Lasting Pump and Motor Attached to Crane for Driving Pipe Pile New Condition
US$9,400.00-10,000.00
1 Piece(MOQ)
Heavy-Duty Vibro Hammer for Efficient S350 Excavator Pile Driving
US$22,000.00-23,000.00
1 Piece(MOQ)
New High-Tech Hydraulic Vibro Hammer with Long-Lasting Engine Pump Attachable to Crane for Driving Pipe Pile for Pile Drivers
US$9,400.00-10,000.00
1 Piece(MOQ)
High Performance Vibro Hammer for Efficient Pile Driving in Construction
US$57,000.00-60,000.00
1 Set/Sets(MOQ)
High-Performance Vibro Hammer for Efficient Pile Driving Solutions S350
US$23,000.00
1 Piece(MOQ)
120kw Vibro Hammer for Efficient Pile Driving in Challenging Soil
US$57,000.00-60,000.00
1 Set/Sets(MOQ)
Pile Driver Attachment for Excavator Drop Vibro Vibratory Hammer for Pile Driving Machine
US$9,400.00-10,000.00
1 Piece(MOQ)
Standard Vibro Pile Hammer for 15 Ton Excavator Sheet Pile Driving
US$10,740.00
1 Piece(MOQ)



















