Powered by Made-in-China.com
Precision Driver Equipment for Deep Foundation Projects with Excavators
US$100,000.00-1,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
FV-700Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
202.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewVibration Frequency
2800 RpmCentrifugal Force
915 kNEccentric Moment
12.3kgmOperation Pressure
32 MPaWork Flow
380 L/MinMax.Pile Length
24mSuitable Excavator
65~75tTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Superior Vibration Power: Features Parker motors, German bearings, and 1064 kN force for heavy piling tasks.
Intelligent Electronic Control: New system optimizes performance, extends lifespan, and enhances precision and safety.
Versatile Application Scenarios: Ideal for deep excavations, bridge piers, port construction, and marine offshore projects.
Global Technical Support: 24/7 technical assistance and spare parts supply available worldwide.
ISO 9001:2015 Certified: Manufactured with high-strength materials ensuring minimal maintenance and quality assurance.
Customizable Configurations: Available in multiple models (FV-500 to FV-900) with tailored designs upon request.
1-Year Warranty Coverage: Comprehensive 12-month warranty covering mechanical defects and parts.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for SEA, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color and logo application.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 compliance. High-strength materials ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency target compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Durable Diaphragm Wall Grab Xg480d Foundation Equipment, 75m Deep Trench Digger for Stable Construction
US$40,000.00-50,000.00
1 Piece(MOQ)
Mini Piledriver Pile Driving Foundation Construction Machinery Pile Driver Drilling Equipment
US$3,000.00-20,999.00
1 Piece(MOQ)
Hfpv-1b Speediness Drilling Equipment for Photovoltaic Power Station Foundation
US$30,000.00-40,000.00
1 Set(MOQ)
Removable Drill Bits Equipment for Engineering Rotary Drilling Rig Construction Machinery
US$1,800.00-3,500.00
1 Piece(MOQ)
Guardrail Install Hydraulic Equipment for U O Shape Pile Installation
US$23,999.00-26,999.00
1 Piece(MOQ)
New Design Hydraulic Pile Equipment for Road Construction
US$23,999.00-26,999.00
1 Piece(MOQ)
New Design Drilling Piling Screwing Hydraulic Pile Equipment for Road Construction
US$23,999.00-26,999.00
1 Piece(MOQ)
Heavy-Duty Piling Equipment with Precision Driver for Large Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
New Photovoltaic Drilling Equipment for Solar Panel Installation Hydraulic Photovoltaic Pile Driver
US$9,800.00-25,000.00
1 Piece(MOQ)
Heavy-Duty Piling Driver and Precision Equipment for Excavators
US$100,000.00-1,000,000.00
1 Set(MOQ)
Precision Engineered ISO Certified Piling Equipment for Bridge Foundations
US$200,000.00
1 Set(MOQ)
Mini Hydraulic Sheet Portable Static Pile Driver Pneumatic Pile Driving Rigs Equipment for Wells
US$5,000.00-6,000.00
1 Set(MOQ)
Precision Driver Equipment for Large Steel Piling Projects and Excavators
US$100,000.00-1,000,000.00
1 Set(MOQ)
Driling Equipment for Construction Machinery
US$1,200.00-2,600.00
1 Piece(MOQ)
Excavator Equipment with Precision Driver for Eccentric Pile Driving
US$100,000.00-1,000,000.00
1 Set(MOQ)
Cost-Effective Small Rotary Micropile Borehole Jet Grouting Drilling Rig Equipment for Consistent Piling Quality
US$20,000.00-25,000.00
1 Set(MOQ)
Intelligent Pile Driving Equipment with Counterweight for Precision
US$300,000.00
1 Set(MOQ)



















