Powered by Made-in-China.com
Reliable Low Clearance Pile Hammer for Construction Site Efficiency
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Low Clearance Design: Side grip design enables piling in minimal headroom spaces like tunnels and under bridges.
360-Degree Rotation: Allows precise pile positioning from any angle without repositioning the excavator.
Dual Clamping System: Side and bottom clamps securely grip piles during driving and extraction without extra equipment.
Versatile Pile Compatibility: Fits multiple pile types including sheet piles, H-beams, and pipes with quick swaps.
Self-Sufficient Operation: Handles clamping, positioning, driving, and extraction independently without cranes.
ISO 9001:2015 Certified: Quality assured through certified manufacturing processes and high-strength materials.
Customization Available: Color scheme and logo application can be customized to match your fleet.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
We adhere to ISO 9001:2015. High-strength materials and durable frame ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency target compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty Full Hydraulic Hammer Pile Driver for Construction Efficiency
US$100,000.00-278,697.00
1 Set(MOQ)
High-Performance Hydraulic Hammer for Reliable Low Clearance Piling Applications
US$100,000.00-10,000,000.00
1 Set(MOQ)
Low Clearance Vibro Hammer for Efficient Site Development Needs
US$100,000.00-10,000,000.00
1 Set(MOQ)
High-Quality Pile High Efficiency Reliable Pile Driving Hammer for Bridges
US$100,000.00-178,697.00
1 Set(MOQ)
High Efficiency User-Friendly High-Quality Pile Hydraulic Piling Hammer for Pile Foundation Construction
US$100,000.00-178,697.00
1 Set(MOQ)
Durable Hydraulic Technology Vibro Hammer for Reliable Low Clearance Piling
US$100,000.00-10,000,000.00
1 Set(MOQ)
Low Clearance Pile Hammer with Superior Efficiency for Heavy-Duty Tasks
US$100,000.00-10,000,000.00
1 Set(MOQ)
Versatile Electric Vibratory Pile Hammer for Construction Site Efficiency
US$62,900.00-83,900.00
1 Piece(MOQ)
Hot Selling New High-Efficiency Solar Pile Driver Pile Hammer Driver Construction
US$9,400.00-10,000.00
1 Piece(MOQ)
Hydraulic Vibro Hammer for Excavator Pile Driver Construction Machine
US$10,000.00
1 Piece(MOQ)
Multi-Function High Efficiency Hydraulic Photovoltaic Solar Pile Drivers with Hammer Pile and Screw Pile for/
US$9,400.00-10,000.00
1 Piece(MOQ)
Crane Type PLC Motor 150kw Realtop Rt-150A High Efficiency Electric Vibro Pile Hammer for Deep Foundation Construction
US$62,900.00-83,900.00
1 Piece(MOQ)
High Efficiency Side Grip Pile Driver Vibro Hammer for 20-30 Ton Excavator
US$23,200.00
1 Piece(MOQ)
Reliable Electric Pile Hammer for Durable Heavy Duty Construction
US$57,000.00-60,000.00
1 Set/Sets(MOQ)
Hydraulic Excavator Vibro Hammer for Construction Vibrating Pile Driver
US$9,400.00-10,000.00
1 Piece(MOQ)
High-Efficiency Solar Pile Hammer for 30 Tons Excavator Rapid Construction Projects
US$16,000.00-16,500.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Vibro Pile Hammer for Sheet Piling Efficiency
US$16,500.00-30,000.00
1 sets(MOQ)
Zss500 Hydraulic Vibro Pile Drive Hammer for Site Pile Zosin Cost-Effective
US$15,000.00-22,000.00
1 Piece(MOQ)



















