Powered by Made-in-China.com
Robust Vibro Hammer for Large-Scale Foundation Construction Projects
US$100,000.00-1,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
FV-800Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
231.0kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewVibration Frequency
2800 RpmCentrifugal Force
997 kNEccentric Moment
14.5kgmOperation Pressure
32 MPaWork Flow
420 L/MinMax.Pile Length
27mSuitable Excavator
75~85tTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Superior Vibration Power: Equipped with Parker motors and German bearings delivering 1064 kN force.
High-Clamping Cast Steel Gripper: Features 160-180 oil cylinders with max 650 kN clamping force.
Intelligent Electronic Control System: Optimizes performance, lifespan, operational precision, and safety.
Versatile Foundation Applications: Ideal for high-rise, bridge, port, marine, and urban infrastructure projects.
Global Technical Support: 24/7 assistance and parts supply available worldwide.
ISO 9001:2015 Certified: Adheres to strict quality standards for durability and minimal maintenance.
Custom Configuration Available: Tailored designs and specifications available upon request.
12-Month Standard Warranty: Comprehensive coverage for all mechanical defects.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
We adhere to ISO 9001:2015. High-strength materials ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency target compacted soils and mixed layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Industrial Hydraulic Vibro Hammer for Large Scale Foundation Work
US$22,000.00-23,000.00
1 Piece(MOQ)
Robust Excavator Vibro Hammer for Fast Foundation Construction
US$22,000.00-23,000.00
1 Piece(MOQ)
Powerful Electric Vibro Pile Hammer for Foundation Construction Projects
US$62,900.00-83,900.00
1 Piece(MOQ)
Robust Electric Vibro Hammer for Efficient Foundation Construction Tasks
US$62,900.00-83,900.00
1 Piece(MOQ)
Robust Vibro Hammer for Superior Construction and Foundation Projects
US$12,000.00-12,500.00
1 Piece(MOQ)
Powerful Vibro Hammer for Durable Foundation Building Solutions
US$100,000.00-10,000,000.00
1 Set(MOQ)
Robust Hydraulic Vibro Pile Hammer for Heavy Construction Projects
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Vibro Pile Hammer for Construction Projects
US$20,000.00-22,000.00
1 Piece(MOQ)
Robust Electric Vibro Hammer for Heavy-Duty Foundation Projects
US$62,900.00-83,900.00
1 Piece(MOQ)
Powerful Hydraulic Rock Hammer for Construction and Mining Projects
US$2,000.00-4,500.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Vibro Hammer for Foundation Construction Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Hydraulic Vibrator Pile Hammer for Construction Foundation
US$17,500.00-20,000.00
1 Piece(MOQ)
Infrastructure Foundation Rt-150A 150kw Electric Vibro Pile Hammer for Large Scale Government Construction Jobs
US$62,900.00-83,900.00
1 Piece(MOQ)
Hydraulic Vibro Hammer for Excavator Pile Driver Construction Machine
US$10,000.00
1 Piece(MOQ)
Versatile Foundation Tool 32MPa Vibro Hammer for Construction Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Excavator Pile Driving Machine - Vibro Hammer for Road and Bridge Construction
US$10,000.00
1 Piece(MOQ)
Reliable Vibro Hammer for Efficient Foundation Construction Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
User-Friendly Low Noise Large Inventory Hydraulic Piling Hammer for Pile Foundation Construction
US$100,000.00-178,697.00
1 Set(MOQ)
High-Tech Vibro Hammer with Long-Lasting Pump Core Attachable Crane for Driving Pipe Piles New Condition for Construction
US$9,400.00-10,000.00
1 Piece(MOQ)
Hydraulic Excavator Vibro Hammer for Construction Vibrating Pile Driver
US$9,400.00-10,000.00
1 Piece(MOQ)



















