Powered by Made-in-China.com
Heavy-Duty Side Grip Pile Driver for Superior Vibration Control
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps grip piles for driving and extraction without extra equipment.
360-Degree Rotation: Full rotation enables precise pile positioning from any angle without repositioning excavator.
Low Clearance Capability: Side grip design allows operations in limited headroom like tunnels and under bridges.
Versatile Pile Compatibility: Accommodates steel sheets, H-beams, and circular pipes with quick clamp changes.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction independently without cranes.
ISO 9001:2015 Certified: High-strength materials and certified quality ensure durability and low maintenance.
Custom Color and Logo: Machine color and logo can be customized to match your fleet requirements.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time?
A:
Lead time is 15-35 days ex-works. Optimized logistics for Asia, India, Russia.
Q:Can the machine match our fleet?
A:
Yes. Includes color and logo customization.
Q:What is the machine's quality and durability?
A:
ISO 9001:2015 certified. High-strength materials reduce maintenance.
Q:Is it suitable for hard soil conditions?
A:
Yes. High force with adjustable frequency for compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Hydraulic Side Grip Pile Driver Sv-200 for Sheet Pile & H-Beam 360° Rotation Low Noise Piling Equipment
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Side Grip Pile Driver with High Vibration Efficiency
US$100,000.00-10,000,000.00
1 Set(MOQ)
Hydraulic Pile Driver Side Grip Vibro Hammer for Steel Sheet Pile Driver Hammer 20-30ton Excavator
US$12,000.00-15,000.00
1 Piece(MOQ)
Heavy-Duty Side Grip Pile Driver with Superior Vibration Control
US$100,000.00-10,000,000.00
1 Set(MOQ)
High-Efficiency Low-Clearance Side Grip Pile Driver for Factories
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Static Pile Driver for Bridges and High-Rise Foundations
US$278,600.00-279,000.00
1 Set(MOQ)
Heavy-Duty Zyc100b-B Pile Driver for Reliable Foundation Support
US$130,000.00
1 Set(MOQ)
Heavy Duty Crawler Pile Driver for PV Panel Foundation
US$23,000.00-25,000.00
1 Piece(MOQ)
Heavy-Duty Zyc120b-B Hydraulic Pile Driver for Extreme Conditions
US$130,000.00
1 Set(MOQ)
Heavy-Duty Zyc100b-B Hydraulic Pile Driver for Tough Projects
US$130,000.00
1 Set(MOQ)
Heavy-Duty Juxiang Hydraulic Pile Driver for Construction Efficiency
US$34,500.00-35,000.00
1 Piece(MOQ)
Jzb240 Walking Pile Driver for Heavy Duty Construction
US$333,300.00-333,333.00
1 Set(MOQ)
Heavy-Duty 40 Ton Hydraulic Vibro Pile Driver for Efficient Construction
US$23,000.00-24,000.00
1 Piece(MOQ)
Heavy-Duty SDLQ 20000mm Rotary Pile Driver for Rock & Clay
US$70,000.00-80,000.00
1 Piece(MOQ)
150s Side Grip Vibro Pile Driver Vibro Hammer for Cat315 Excavator
US$17,900.00
1 Piece(MOQ)
Durable 360° Hydraulic Pile Driver for Heavy-Duty Excavators
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Excavator-Mounted Pile Driver for Road, Bridge & Port Construction
US$11,000.00-20,000.00
1 piece(MOQ)
Heavy-Duty Jzl90 Construction Pile Driver for Efficient Groundwork
US$165,000.00-170,000.00
1 Piece(MOQ)
Hydraulic Side Grip Pile Driver for Excavators with Vibratory Driving Function
US$23,300.00
1 Piece(MOQ)
Heavy-Duty 6T Solar Farm Pile Driver for Deep Foundations
US$22,000.00-26,000.00
1 Piece(MOQ)



















