Powered by Made-in-China.com
Superior Vibration Piling Driver for Heavy-Duty Construction Tasks
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps grip piles during driving and extraction without auxiliary equipment.
360-Degree Rotation: Full rotation allows precise pile positioning from any angle without repositioning.
Versatile Pile Compatibility: Accommodates steel sheets, H-beams, and pipes with quick change clamp seats.
Low Clearance Capability: Designed for limited headroom in factories, under bridges, and tunnels.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction independently.
ISO 9001:2015 Certified: Ensures high quality and durability with high-strength materials.
Custom Configurations: Customizable color, logo, and designs available upon request.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time?
A:
Lead time is 15-35 days ex-works. Optimized logistics for Asia, India, Russia.
Q:Can the machine match our fleet?
A:
Yes. Customization includes color and logo.
Q:What is the machine's quality and durability?
A:
ISO 9001:2015 certified. High-strength materials for minimal maintenance.
Q:Is it suitable for hard soil conditions?
A:
Yes. High force and adjustable frequency target compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty Hydraulic Pile Driver for Reliable Foundation Construction
US$150,000.00-178,697.00
1 Set(MOQ)
Heavy Duty Vibratory Pile Driver for Strong Construction Applications
US$100,000.00-1,000,000.00
1 Roll(MOQ)
Heavy-Duty Piling Driver with Precision Control for Excavators
US$100,000.00-1,000,000.00
1 Set(MOQ)
T-Works Heavy Duty Electric Hydraulic Static Pile Driver for Construction Foundation
US$130,000.00
1 Set(MOQ)
Durable Side Grip Pile Driver for Heavy-Duty Construction Needs
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Hammer 2800 Rpm Pile Driver for Construction Machinery
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Static Pile Driver Zyc360b-B for Construction
US$150,000.00-278,697.00
1 Set(MOQ)
Heavy-Duty 90 Ton Hydraulic Pile Driver Zyc100b-B for Construction Projects
US$130,000.00
1 Set(MOQ)
Heavy-Duty Excavator Hydraulic Pile Driver Hammer for Sheet Piling Construction Projects
US$23,000.00-24,000.00
1 Piece(MOQ)
Heavy-Duty Vibro Pile Driver for Robust Construction Projects
US$11,500.00-13,000.00
1 Piece(MOQ)
Heavy-Duty Excavator-Mounted Pile Driver for Road, Bridge & Port Construction
US$11,000.00-20,000.00
1 piece(MOQ)
Heavy Duty 30 Ton Excvator Hydraulic Tilt Pile Driver for Construction Projects
US$14,500.00
1 Piece(MOQ)
Heavy Duty Garden Stake Driver Post Slide Hammer Driver for Piling Projects
US$1,266.00
16 Pieces(MOQ)
Juxiang Heavy-Duty Excavator Vibro Pile Driver for Efficient Construction
US$23,000.00-24,000.00
1 Piece(MOQ)
Heavy Duty Side Clamp Pile Driver for Excavator Foundation and Retaining Walls
US$23,300.00
1 Piece(MOQ)
Heavy-Duty Pile Driver Attachment for Excavators and Construction
US$21,500.00-24,150.00
1 Set(MOQ)
Heavy-Duty Hydraulic Piling Driver for 12-17 Ton Excavators
US$10,000.00-12,000.00
1 Piece(MOQ)
Heavy-Duty Jzl90 Pile Driver for Fast Construction Success
US$165,000.00-170,000.00
1 Piece(MOQ)
10m Heavy Duty Photovoltaic Pile Driver for Large Solar Farm Construction
US$26,999.00-27,590.00
1 Set(MOQ)
Powerful Jzl90 Construction Pile Driver for Heavy-Duty Projects
US$165,000.00-170,000.00
1 Piece(MOQ)



















