Powered by Made-in-China.com
Superior Vibration Vibro Hammer for Efficient Building Projects
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps grip piles for driving and extraction without extra equipment.
360-Degree Rotation: Full rotation allows precise pile positioning from any angle without repositioning.
Versatile Pile Compatibility: Accommodates steel sheets, H-beams, and pipes with quick-change clamp seats.
Low Clearance Capability: Side grip design enables operations under bridges, tunnels, and in limited headroom.
Complete Piling Cycle: Performs clamping, positioning, driving, and extraction independently without cranes.
Adaptable to Hard Soil: High force and adjustable frequency handle compacted soils and diverse geological conditions.
ISO 9001:2015 Certified: Manufactured with durable materials ensuring minimal maintenance and high quality.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:Minimum order quantity?
A:
MOQ is one set.
Q:Delivery lead time to our region?
A:
15-35 days ex-works. Logistics optimized for Asia, India, Russia.
Q:Can the machine match our fleet?
A:
Yes. Customizable color and logo.
Q:Machine's quality and durability?
A:
ISO 9001:2015 certified. Durable materials, minimal maintenance.
Q:Suitable for hard soil conditions?
A:
Yes. High force & adjustable frequency for compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
350 kN Allowed Pulling Pile Force Electric Vibro Pile Hammer for Concrete Piles on Residential and Commercial Building Projects
US$62,900.00-83,900.00
1 Piece(MOQ)
Efficient Vibro Hammer for Photovoltaic Structure Setup Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Urban Foundation Rt-150A 150kw Electric Vibro Pile Hammer for City Center Building and Metro Station Projects
US$62,900.00-83,900.00
1 Piece(MOQ)
Powerful Vibro Hammer for Durable Foundation Building Solutions
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Vibro Hammer for Maximum Efficiency and Performance
US$100,000.00-10,000,000.00
1 Set(MOQ)
Rt-150A 150kw Electric Vibro Pile Hammer for Precast Concrete Pile Foundations in Industrial Building Projects
US$62,900.00-83,900.00
1 Piece(MOQ)
Reliable Vibro Hammer for Efficient Foundation Construction Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
Efficient Electric Vibro Hammer for Soft Soil Foundation Projects
US$62,900.00-83,900.00
1 Piece(MOQ)
Efficient for Cat320 8-12m Pile Driving Machine Side Clamp Vibro Hammer
US$23,400.00
1 Piece(MOQ)
Powerful Excavator Mounted Vibro Hammer for Efficient Piling
US$20,000.00
1 Piece(MOQ)
High-Power Hydraulic Vibro Hammer for Efficient Construction Projects
US$12,000.00-12,500.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Vibro Pile Hammer for Construction Projects
US$20,000.00-22,000.00
1 Piece(MOQ)
Heavy-Duty Vibro Pile Hammer for Efficient Excavation Projects
US$22,000.00-23,000.00
1 Piece(MOQ)
Hydraulic Vibratory Pile Driving and Sinking Vibro Hammer for Cofferdam or Bridge
US$100,000.00-1,000,000.00
1 Piece(MOQ)
Premium Vibro Hammer for Efficient Pile Driving Solutions
US$20,000.00-22,000.00
1 Piece(MOQ)
Premium Excavator Vibro Hammer for Sheet Piling Projects
US$21,000.00-22,500.00
1 sets(MOQ)
Durable Cylinder Tilting Pile Hammer for Efficient Building Projects
US$20,000.00-21,000.00
1 Piece(MOQ)
Powerful Dual Motor Hydraulic Vibro Hammer for Fast Building Projects
US$34,500.00-35,000.00
1 Piece(MOQ)
One-Stop Solution Multiple Piles Suitable Pile Driver Side Grip Vibro Hammer for Foundation Work
US$23,350.00
1 Piece(MOQ)



















