SourcingAI
Try for free
Powered by Made-in-China.com
Innovative Double Locked Metal Gland for All Weather Applications
US$1.22-8.58
50 Pieces
Sample price:US$5.00/piece.Request sample

Product profile

Customization

Available

Certification

RoHS, ISO, CE

Surface Treatment

Polishing

Model NO.

YKWB-DLS

Color

Sliver

IP Rating

IP68

Material

Brass

Type

Straight Head

Working Temperature

-40℃~+120℃

Hermetric

NBR

Claw

PA6

O-Ring

NBR

Thread

Metric, Pg, G, NPT

Transport Package

Plastic Bag in Carton

Specification

NPT series

Trademark

YIKWE

Origin

Jiangsu

HS Code

8547901000

Production Capacity

1000000000

Key features

IP68 Protection Rating: Provides complete dust tightness and protection against long-term immersion in water.
Premium Material Options: Constructed from SS304/316 stainless steel with NBR O-rings for corrosion resistance.
RoHS Certified: Manufactured in compliance with RoHS standards for restricted hazardous substances.
Comprehensive Thread Compatibility: Supports Metric, PG, G, and NPT thread standards for versatile installation.
OEM and ODM Services: Offers full customization, minor customization, and design-based customization options.
100% Quality Inspection: Every finished product undergoes visual and functional inspection before shipping.
Fast Lead Time: Average production time within 15 working days for both peak and off-peak seasons.

Company profile

Jiangsu Yikawei Electronic Technology Co., Ltd.
In-stock CapacityFull CustomizationStandardized quality controlProduct Certification
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 4 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤1.14h

About Our Factory & Business Background

AddressInternet Building, Yancheng, Jiangsu, China
Plant Area2088 square meters
Number of Employees36
Registered Capital10,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity10 Pcs
Supply Chain Partners5

Our Production Capability & Technical Expertise

Main ProductsCable Gland, EMC glands, Multi-Core Cable Gland, Double Compression Explosion Proof Cable Gland. Marine Cable Gland, Stainless Steel Conduit Connector, Variable Diameter Ring, Plug
Production Lines1
Production MachinesCNC Lathe, Laser Marking Machine, Engraving Machine, Polishing Machine, Cleaning Machine, Sawing Machine, Thread Rolling Machine, Tapping Machine, Drilling Machine, Radial Drilling Machine, Grinding Machine, Automatic Punching Machine, Bending Machine, Milling Machine, Welding Machine, Punching Machine, NC EDM Wire-cut Machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers2 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2021-02-22
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Product CertificationCE, Others
Cooperated with Fortune 500No

Product Q&A

Q:What materials are available for this gland?
A:
The product is available in SS304 and SS316L stainless steel.
Q:Does this product support different thread types?
A:
Yes, it supports Metric, PG, G, and NPT thread standards.
Q:Is customization available for this product?
A:
Yes, we offer OEM, ODM, and flexible customization from samples or designs.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 10 pieces.
Q:How long does production take?
A:
Production is completed within 15 working days for both peak and off-peak seasons.

Send Inquiry

*To:Jiangsu Yikawei Electronic Technology Co., Ltd.Jiangsu Yikawei Electronic Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like