Powered by Made-in-China.com
Ready Stock Fast Delivery PV MID Clamp Meet Urgent Solar Construction Schedule Demand
US$1.80
50-99 Pieces
US$1.20
100-499 Pieces
US$0.80
500-999 Pieces
US$0.30
1,000-2,999 Pieces
US$0.20
3,000+ Pieces
Sample price:US$5.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Sample SupportWarranty
2 YearsModel NO.
YS2Certification
GB, ISO, CEApplication
IndustrialMaterial
Aluminum AlloyType
Roof Ballast BracketColor
CustomozedSize
CustomizedRaw Material
6063-T5 Aluminum AlloyProduct Name
PV Aluminum MID ClampItem No.
Customized as RequestBrand
Support OEM / ODMPlace of Origin
ChinaApplications
Solar Mounting System, PV Power StationSurface Treatment
Silver Anodized / Black AnodizedOxide Film Thickness
8-10μmMetal Grade
Aluminum AlloyStandard Length
40mm 50mm 60mm 80mmCustom Length
AcceptableWall Thickness
2.0mm / 2.5mm / 3.0mmModule Gap
20mm / 26mm / 28mmTransport Package
CartonSpecification
20mm / 26mm / 28mmTrademark
YSOrigin
ChinaHS Code
8529908900Production Capacity
1000000Key features
Made of 6063-T5 aluminum alloy with high structural strength
Silver anodized surface for excellent anti-rust and UV resistance
U-shaped double-groove design stably clamps two adjacent solar panels
Lightweight material reduces overall load of solar mounting system
Non-conductive aluminum avoids electric leakage risk for PV modules
Extruded integrated molding without welding, uniform force bearing
Compatible with 35/40/42mm standard solar panel frames
Perfect match with solar rails, T-bolts and spring nuts for easy installation
Customizable cutting length to meet different project requirements
Long service life, suitable for rooftop and ground photovoltaic power stations
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤9.21h
About Our Factory & Business Background
AddressNanpi County, Cangzhou, Hebei, China
Plant Area800 square meters
Number of Employees13
Registered Capital1,000,000 RMB
Terms of PaymentLC, D/P, T/T, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 set
Supply Chain Partners5
Our Production Capability & Technical Expertise
Main ProductsSheet metal stamping part, Solar panel bracket, PV mounting system, Solar mounting system, Curtain wall bracket
Production Lines1
Production MachinesLaser cutting machine, Bending machine, Press riveting machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2024-03-07
Main MarketsDomestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff1
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:Are your solar mid clamps compatible with all solar panels?
A:
Our standard mid clamps fit 35mm/40mm/42mm PV module frames. Custom profiles can be made for special thickness panels like 30mm or 45mm.
Q:What panel gaps do you have for selection?
A:
We supply 20mm, 26mm and 28mm gap sizes. 26mm is the universal size for most rooftop and ground solar projects.
Q:Can I order samples before bulk purchase?
A:
Yes, free sample is offered, you only need to bear the shipping freight. Sample delivery takes about 3-7 days.
Q:What surface finishes are available?
A:
Standard silver anodized finish in stock; black anodized is optional with extra unit cost.
Q:Do you sell full installation kits including bolts?
A:
Two options for you: single aluminum mid clamp only, or complete set matched with M8 T-bolt, spring nut, flat & spring washers.
Send Inquiry
*To:
Cangzhou Yingsheng Hardware Manufacturing Co., Ltd.
Cangzhou Yingsheng Hardware Manufacturing Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Mass Stock Available Solar MID Clamp Timely Delivery
US$0.26-1.82
1,000 Pieces(MOQ)
Size Laser Marked Solar MID Clamp Fast Classification for Large-Scale Construction Inventory
US$0.20-1.80
50 Pieces(MOQ)
Ready Stock Solar MID Clamp Complete Prompt Shipment on Tight PV Project
US$0.24-0.35
50 Sets(MOQ)
Three-Day Quick Custom Sample PV MID Clamp Meet Customers Urgent Sample Inspection Needs
US$0.20-1.80
50 Pieces(MOQ)
Low MOQ Ready Stock PV MID Clamp Suitable for Small Solar
US$0.26-1.82
1,000 Pieces(MOQ)
Time Saving Solar MID Clamp for Fast Field PV Module Assembly
US$0.30-0.50
1 Piece(MOQ)
Anti-Rust Solar MID Clamp End Clamp for Tile Roof Flat Roof PV Mounting System
US$0.25-0.30
1 Piece(MOQ)
Solar Panel MID Clamp Aluminum Alloy for 35mm Module Mounting Rail Wholesale Price Fast Shipping
US$0.25-0.30
1 Piece(MOQ)
Solar Clip Panel Ground System Metal MID Clamp Photovoltaic PV Roof Structural End Clamps
US$0.25-0.30
1 Piece(MOQ)
Professional MID Clamp for Ground Mount PV System Heavy Duty Steel Fast Shipping
US$0.25-0.30
1 Piece(MOQ)
Factory Direct Sale on Stock PV Solar Rooftop Mounting Grounding Pin Solar MID Clamp
US$0.117-0.123
1 Piece(MOQ)
Adjustable Easy Installation Anodized Aluminum Solar PV Panel Mounting MID Clamp
US$0.36-0.50
100 Pieces(MOQ)
PV Module Solar MID Clamp for Solar Panel Mounting Kit, Compatible with Various Frame Thicknesses
US$0.3769
10,000 Pieces(MOQ)
Aluminum PV Mounting System Brackets Solar Rapid MID and End Clamp Black
US$0.38-0.58
1 Piece(MOQ)
PV Module Solar Panel MID Clamp for Solar Ground Mounting System, Meeting International Safety Standards
US$0.2615
10,000 Pieces(MOQ)
Aluminum 35mm-50mm PV Mounting System Solar Panel MID and End Clamp
US$0.25-0.35
1 Piece(MOQ)
Aluminium Solar Mounting System Structure PV Framed Panel MID Solar Clamp
US$1.49-3.99
100 Pieces(MOQ)
Solar Module Clamp for PV Mounting Solar Roof End Clamp MID Clamp
US$0.25-0.45
1 Set(MOQ)
PV Module MID Clamp for Solar Carport Structure, Perfect for Heavy-Duty Solar Projects
US$0.2615
10,000 Pieces(MOQ)



















