Powered by Made-in-China.com
Fiberglass Stable-Performance Cooler Low-Maintenance Closed-Circuit Tower
US$5,000.00
1 Piece
Product specifications
FRP Cooling Tower
Sample price:US$9999.00/piece.Request sample
Product profile
Customization
AvailableSurface Treatment
SmoothColor
WhiteModel NO.
CustomisedThickness
CustomizedUsage
Environmental Protection, IndustralProduct Categories
TowerMolding Method
MoldingMaterial
FiberglassFiber Type
GFRPType
Epoxy FRPPerformance
Energy-SavingWeather Resistance
Corrosion-ResistantOperation
Low-NoiseStructure
LightweightService Life
Long-LastingEnvironmental Protection
Water-SavingMaintenance
Low-MaintenanceAdaptability
CustomizableWorking Condition
High-Temp ResistantInstallation
Easy-InstallationTransport Package
Wooden PackagesSpecification
CustomizedTrademark
YI YANGOrigin
Hebei ChinaKey features
Corrosion and UV Resistance: Constructed with high-quality FRP to resist corrosion, UV radiation, and chemical exposure.
Energy Efficient Design: Advanced fill media optimizes air-water contact for superior heat transfer and minimal energy consumption.
Customizable Structure: Thickness and specific components like access doors and ladder assemblies are customizable.
Easy Maintenance: Reinforced FRP base with integrated drainage channels and low-maintenance design.
Versatile Applications: Ideal for chemical, power generation, HVAC, manufacturing, and data center cooling.
Long Service Life: Engineered for durability with resistance to extreme temperature fluctuations and harsh environments.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 5 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤7.15h
AI-Powered supplier vetting
SummaryThe supplier is identified as a professional technical supplier with 3D design, OEM, ODM, and broad customization capabilities. It reports raw-material traceability, 100% finished-product inspection, documented quality procedures, complaint handling, and corrective/preventive-action mechanisms. Production information indicates two production lines, 31–40 quality-control staff, and lead times within 15 working days in both peak and off-peak periods. However, the evidence shows no available SDK, no new products in the past year, no overseas agents, branches, warehouse, showroom, or offline trade-show participation. No certification information or verifiable customer cases is provided. Manufacturing capacity is also affected by the absence of a valid contract with an associated subcontractor.
Supplier typeThe supplier explicitly identifies itself as a professional technical supplier and provides 3D software design, OEM, ODM, and assembly-related services. This supports classification as a technical and manufacturing service supplier.
After-Sales capabilityThe supplier has documented and followed procedures for handling customer complaints, as well as corrective and preventive actions. This is explicit evidence of a structured after-sales response process.
R&D capabilityThe supplier offers 3D software design and ODM services, indicating design capability, but reports no available SDK and no new products during the past year. The evidence therefore shows design support but not strong recent product innovation.
Production capacityThe supplier reports two production lines, 31–40 quality-control staff, 100% finished-product inspection, and lead times within 15 working days in both peak and off-peak seasons. However, it also reports no valid manufacturing-capacity contract with an associated subcontractor, which is an explicit capacity-management deficiency.
Customization capabilityThe supplier supports customization from samples, designs, full customization, minor customization, and flexible customization, and also provides OEM and ODM services. These statements explicitly demonstrate broad customization capability.
Client casesThe supplier states that it provides OEM services for well-known brands, which is evidence of brand-related customer experience. However, no customer names, project details, or independently verifiable cases are provided.
Product Q&A
Q:Are you a trading company or a manufacturing plant?
A:
We are an export qualified manufacturing plant and one of the best manufacturers of FRP products in China.
Q:How long is your delivery time?
A:
Generally 5-10 days if goods are in stock, or 10-15 days if not in stock, depending on quantity.
Q:Do you provide samples? Is it free or extra?
A:
Yes, we can offer samples for free charge, but the cost of freight is not covered.
Q:How can you guarantee quality?
A:
We always produce a pre-production sample before mass production and conduct a final inspection before shipment.
Q:What delivery terms do you accept?
A:
We accept FOB, CFR, CIF, EXW, FCA, DDP, and DDU delivery terms.
Send Inquiry
*To:
Hebei Yiyang Environmental Protection Equipment Co., Ltd.
Hebei Yiyang Environmental Protection Equipment Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Fiberglass High-Performance Cooler Low-Maintenance Closed-Circuit Tower
US$5,000.00
1 Piece(MOQ)
Fiberglass Mechanical Draft Cooler Efficient Closed-Circuit Tower
US$5,000.00
1 Piece(MOQ)
FRP GRP Fiberglass Square Cooling Tower Customized Low Maintenance Cost for Industrial Cooling
US$5,000.00-16,000.00
1 Piece(MOQ)
Fiberglass Swift-Cooling Cooler Low-Maintenance Closed-Circuit Tower
US$5,000.00
1 Piece(MOQ)
Fiberglass Anti-Fouling Tower Low-Maintenance Closed-Circuit Cooler
US$5,000.00
1 Piece(MOQ)
Closed Countercurrent Square Cooling Tower, Fiberglass Cooling Water Machine Tower
US$1,171.00
1 Pieces(MOQ)
Industrial Counterflow Water Counterflow Cross Flow Fiberglass, Spiral Square Open Chiller, Circular Closed Cooling Tower
US$2,000.00-45,000.00
1 Set(MOQ)
Low Lower Fiberglass Cooling Tower Manufacturer FRP Cooling Tower Filler
US$4,500.00-5,000.00
1 piece(MOQ)
Closed Cycle Industrial Spray Circular Condenser Cooling Tower
US$1,000.00-100,000.00
1 Set(MOQ)
Corrosion Resistant FRP Fiberglass Absorption Tower for Chemical Industry
US$5,000.00-27,000.00
1 Piece(MOQ)
Industrial R717/ Refrigerant Cooling Tower Straight Flow Closed Condenser
US$1,000.00-100,000.00
1 Set(MOQ)
High Efficiency FRP Fiberglass Gas Absorption Tower GRP Waste Gas
US$990.00-1,000.00
10 Sets(MOQ)
Chemical Resistant, Low Maintenance, Long Service Life Fiberglass Tower / FRP Scrubber
US$1,000.00-50,000.00
1 Piece(MOQ)
High Quality Fiberglass FRP Drying Tower
US$200.00-2,000.00
1 Piece(MOQ)
New Type Industrial Open Round Bottle Type Counterflow FRP Fiberglass Water Cooling Tower Manufacture
US$4,500.00-5,000.00
1 piece(MOQ)
High-Performance FRP GRP Fiberglass Scrubber Tower for Gas Purification
US$100.00
1 Meter(MOQ)
FRP GRP Fiberglass Chloride Washing Absorption Tower
US$990.00-1,000.00
10 Sets(MOQ)



















