SourcingAI
Try for free
Powered by Made-in-China.com
Electric Power Tool Well Price 2000W 230mm Electric Tool Angle Grinder
US$34.86-38.13
1,000 Pieces
Sample price:US$34.86/piece.Request sample

Product profile

Customization

Available

Type

Angle Grinder

Power Source

Electricity

Model NO.

TKF61181

Object

Metal Parts, FRP, Tiles, Woods

Application

Construction, Machine Manufacturing, Carpentry

Disc(Wheel) Type

Grinding Disc

Material

Aluminum Alloy & Plastic

Working Style

High-speed universal

Disc Diameter

230mm

Variable Speed

Without Variable Speed

Yields

200, 000PCS/Month

N.W.

13kg

G.W.

14kg

Rated Voltage

230V

Rated Frequency

50Hz

Transport Package

Carton

Specification

53.5x12.5x17cm

Trademark

TKF

Origin

China

HS Code

846729

Key features

Powerful 2000W Motor: Delivers 6000 rpm no-load speed for heavy-duty grinding and cutting tasks.
Soft Starter Design: Ensures smoother start-up, enhancing operator safety and extending tool life.
Ergonomic Slim Body: Designed to enhance user comfort and control during extended use.
Durable Construction: Features high-quality machining gears and aluminum alloy/plastic materials.
Versatile Application: Suitable for metal parts, FRP, tiles, and wood in construction and carpentry.
Customizable Packaging: Offers pallet, wooden case, or carton options based on specific customer requirements.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2021-04-07Nearest Port: GuangzhouAverage Response Time: ≤4.56hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DDP, FCA, EXW, Others

AI-Powered supplier vetting

SummaryTAYLOR HOLDINGS LIMITED is a China-based trading company and manufacturer/factory in Guangxi, supplying refrigeration compressors, HVAC components, construction machinery parts, polyurea waterproof and protective coatings, and related equipment. It reports ISO 9001 certification, two production lines, fewer than five quality-control staff, and fewer than five years of R&D-engineer experience. Export activity is reported at 71%–90% of sales, with markets including Eastern Europe, the Middle East, North America, Southeast Asia, and Eastern Asia. The supplier states an off-peak lead time within 15 working days and peak-season fulfillment of one month. Available trade records show limited transactions involving compressor products, with one or two transactions associated with each listed buyer. Evidence is insufficient to confirm after-sales service, customization capability, financial credibility, or strong innovation performance.
Supplier typeThe supplier is explicitly identified as both a trading company and a manufacturer/factory. Its stated business scope covers machinery, engines, refrigeration equipment, decorative materials, and related industrial products, indicating a mixed supply and production model.
CertificationsThe supplier reports holding ISO 9001 certification. This provides explicit evidence of a certified quality-management system, although no certificate number, issuing body, scope, or validity period is provided.
Production capacityThe supplier identifies itself as a manufacturer/factory, lists refrigeration compressor and coating production activities, and reports two production lines. It also states an off-peak lead time within 15 working days and peak-season fulfillment of one month, but capacity beyond these indicators is not established.
Client casesTrade records identify QR TORREON S DE RL DE CV in Mexico and PACK TECH PRIVATE LIMITED in Pakistan as associated buyers for compressor products. The records show limited transaction counts—one and two respectively—so they demonstrate some buyer activity but do not establish a broad or deep customer case history.

Product Q&A

Q:What is the price for angle grinder?
A:
The price is negotiable according to the quantity of the order.
Q:What about samples?
A:
Sample lead time is 10 working days. For regular customers, it is free. For new customers, a fee is charged first and refunded when the order is confirmed.
Q:What about the lead time on order?
A:
It takes about 20 days after the order confirmed.
Q:What about packaging?
A:
Use pallet, wooden case or with outer carton, or as customers' specific requirements.
Q:What about shipping?
A:
We offer three options: 1) By Express (3-5 days via DHL, UPS, etc.); 2) By Air (5-8 days to airport); 3) By Sea (varies by destination, e.g., Europe & America 25-35 days, Asia 3-7 days).

Send Inquiry

*To:TAYLOR HOLDINGS LIMITEDTAYLOR HOLDINGS LIMITED
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like