Powered by Made-in-China.com
OEM Data Center and Server Room Electrical Cabinet Fabrication
US$111.12-3,402.78
1 Piece
Product specifications
chassisi
Sample price:US$5.00/piece.Request sample
Product profile
Customization
AvailableStandard
GB, EN, China GB Code, JIS Code, TEMA, ASMETolerance
+/-0.10mmSurface Treatment
Powder CoatedMachining Method
Laser Cutting/CNC Stamping/Bending/WeldingMaterial
Stainless Steel/Aluminum/CopperType
Cold StampingProcessing Type
Shaping MetalMould
Multistep Progressive DiesSurface Processing
ElectroplatingFine Blanking
Double ActingProcess
Forming ProcessIndustry
Metal Stamping PartsTolerances
0.1mmCustomized
CustomizedAfter-Sales Service
24 Hours OnlineWarranty
1 YearMaterial
Stainless Steel, AluminumStructure
ProtectionShell Material
Stainless SteelColor
White, Black, Bright ColorPackaging
Bubble WrapTransport Package
Wooden TraySpecification
ATX Micro-AtxTrademark
Yong'an Hardware ManufacturingOrigin
ChinaHS Code
84733090Production Capacity
50000PCS Per MonthKey features
Comprehensive Physical Protection: Prevents dust, moisture, EMI, and accidental damage while ensuring structural support.
Efficient Heat Dissipation Design: Features ventilation holes, fan mounts, and airflow channels for stable operation.
Secure Lock Mechanisms: Equipped with locks to prevent unauthorized access and unified cable management.
Multi-Standard Compliance: Meets GB, EN, JIS, TEMA, and ASME standards with +/-0.10mm tolerance.
Wide Material Selection: Processes Stainless Steel, Aluminum, Copper, Iron, and Brass with various treatments.
1-Year Warranty Coverage: All products undergo strict testing and come with a 1-year warranty period.
Flexible Customization Options: Supports custom size, material, color, and functions based on design drawings.
15 Years Professional Experience: Source company with 6,000 sqm facility and 13 production lines for metal stamping.
Company profile
Business Type: Manufacturer/Factory CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization, etc.Nearest Port: Tianjin PortAverage Response Time: ≤4.84h CertifiedInternational Commercial Terms(Incoterms): FOB
About Our Factory & Business Background
AddressCangzhou, Hebei, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsMetal Stamping Part, Metal Enclosure, Sheet Metal Enclosure, Electrical Cabinet, Network Cabinet, Power Distribution Box, Stainless Steel Fabrication, Sheet Metal Fabrication
Production Lines13
Production MachinesAutomatic film wrapping machine, Automatic plate shearing machine, Bending machine, Grinder, Laser cutting machine, punch press, Riveting press, Tapping machine
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:Is the quality of your products guaranteed?
A:
We have strict control over product quality. All products go through multiple testing procedures and come with a 1-year warranty.
Q:Can you provide samples?
A:
Of course. We support providing free samples, but you will need to bear the shipping costs. For customized samples, a certain sample production fee will be charged. This fee can be refunded when you place a subsequent order reaching a certain quantity.
Q:Can products be customized?
A:
Yes. We support customization according to your specific needs, including size, material, color, and functions. You can provide detailed design drawings or parameters, and we will offer you professional customization solutions and quotations.
Q:How long does it take to ship after payment?
A:
For regular in-stock products, we will arrange shipment within 1-3 working days after your payment. For customized products, the specific shipping time depends on the production cycle, and our sales staff will provide you an accurate delivery time when confirming the order.
Q:How long does it take to deliver for bulk orders?
A:
The delivery time for bulk orders depends on the product type and specific quantity. Generally, the production cycle is about 1-3 weeks.
Send Inquiry
*To:
Nanpi County Yong'an Hardware Manufacturing Co., Ltd.
Nanpi County Yong'an Hardware Manufacturing Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Data Center Enclosure Server Rack Manufacturer Network Cabinet Sheet Metal Fabrication
US$0.01-10,000.00
1 pcs(MOQ)
Data Center Enclosure Server Rack Manufacturer Network Cabinet Fabrication
US$0.01-10,000.00
1 pcs(MOQ)
Customized Server Rack Enclosure Cabinet Data Center Sheet Metal Fabrication
US$200.00-600.00
100 Sets(MOQ)
Data Center Enclosure Fabrication Server Rack Manufacturer Network Cabinet Sheet Metal Steel Fabrication
US$0.01-10,000.00
1 pcs(MOQ)
OEM Sheet Metal Parts Enclosure Steel Electrical Cabinet Housing Custom Fabrication Service
US$1.90-8.99
1 Piece(MOQ)
OEM Data Center Cabinet Sheet Metal Fabrication for Server Rack Systems
US$0.50
1 Piece(MOQ)
OEM Cabinet Aluminum Sheet Metal Fabrication for Computer/Enclosure Electrical Equipment Box
US$0.89-5.19
100 Pieces(MOQ)
Custom Sheet Metal Enclosure Cabinet Manufacturer OEM Stainless Steel Electrical Box Fabrication
US$0.59-2.89
100 Pieces(MOQ)
Telecom Cabinet & Server Rack Enclosure Custom Fabrication
US$0.50
1 Piece(MOQ)
Custom Telecom & Data Center Cabinet Fabrication
US$0.50
1 Piece(MOQ)
Custom Electrical Distribution Enclosure SPCC Carbon Steel Powder Coated Sheet Metal Fabrication OEM
US$0.10-200.00
50 Pieces(MOQ)



















