SourcingAI
Try for free
Powered by Made-in-China.com
Plastic Injection Molding Part for Industrial Plastic Handle Components
US$0.10-1.00
100 Pieces

Product specifications

chassisi

Sample price:US$1.00/piece.Request sample

Product profile

Customization

Available

Material

PE/PVC/ABS

Application

Medical, Household, Electronics, Automotive, Agricultural, Store It Devices Such as Servers, Switches

Model NO.

Injection Molded Parts

Certification

ISO9001:2000, CCC

Color

Customization Available

Customized

Yes

OEM / ODM

Supported

Application Scenario

Automotive Parts/Industrial Equipment Components

Transport Package

Wooden Tray

Specification

Customer Size Accepted

Trademark

Yong'an

Origin

China

HS Code

84733090

Production Capacity

50000PCS Per Month

Key features

Multi-Material Options: Available in ABS, PVC, PE, PP, and Nylon to meet diverse mechanical and environmental needs.
Full Customization Support: Customizable structure, size, material, color, and logo with OEM/ODM services.
High Precision Manufacturing: Precision injection molding ensures stable dimensions, uniform wall thickness, and tight tolerances.
Superior Durability: Excellent impact resistance, oil and chemical resistance, and long service life for repeated use.
Versatile Applications: Ideal for automotive parts, industrial equipment, medical devices, and consumer electronics.
1-Year Warranty: All products come with a comprehensive 1-year warranty covering quality defects.
ISO9001 Certified: Manufacturing process certified under ISO9001:2000 and CCC standards for quality assurance.
Fast Shipping: Regular in-stock products ship within 1-3 working days after payment.

Company profile

Nanpi County Yong'an Hardware Manufacturing Co., Ltd.
High Repeat Buyers ChoiceExhibition ExperienceIn-stock CapacityFast Delivery
Business Type: Manufacturer/Factory CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization, etc.Nearest Port: Tianjin PortAverage Response Time: ≤4.29h CertifiedInternational Commercial Terms(Incoterms): FOB

About Our Factory & Business Background

AddressCangzhou, Hebei, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsMetal Stamping Part, Metal Enclosure, Sheet Metal Enclosure, Electrical Cabinet, Network Cabinet, Power Distribution Box, Stainless Steel Fabrication, Sheet Metal Fabrication
Production Lines13
Production MachinesAutomatic film wrapping machine, Automatic plate shearing machine, Bending machine, Grinder, Laser cutting machine, punch press, Riveting press, Tapping machine

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Is the quality of your products guaranteed?
A:
We have strict control over product quality. All products go through multiple testing procedures and come with a 1-year warranty.
Q:Can you provide samples?
A:
Of course. We support providing free samples, but you will need to bear the shipping costs. For customized samples, a certain sample production fee will be charged. This fee can be refunded when you place a subsequent order reaching a certain quantity.
Q:Can products be customized?
A:
Yes. We support customization according to your specific needs, including size, material, color, and functions. You can provide detailed design drawings or parameters, and we will offer you professional customization solutions and quotations.
Q:How long does it take to ship after payment?
A:
For regular in-stock products, we will arrange shipment within 1-3 working days after your payment. For customized products, the specific shipping time depends on the production cycle, and our sales staff will provide you with an accurate delivery time when confirming the order.
Q:How long does it take to deliver for bulk orders?
A:
The delivery time for bulk orders depends on the product type and specific quantity. Generally, the production cycle is about 1-3 weeks.

Send Inquiry

*To:Nanpi County Yong'an Hardware Manufacturing Co., Ltd.Nanpi County Yong'an Hardware Manufacturing Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like