Powered by Made-in-China.com

Wholesale Top Quality Green Pin G6411 Hot Dipped Galvanized Closed Spelter Socket Connection Link
US$0.10-30.00
1,000 Pieces
Product profile
Customization
AvailableTesting
QualityBreakage Test
100%Surface
Hot Dipped Galvanized, Electro Galvanized, Color PTechnology
Casting, ForgingFinish
Hot Dipped Galvanized, Electro Galvanized, Color PUse
Fittings, Lifting, Connecting, etc.Logo Customization
AcceptInspection
Mill Test Certificate Can Be ProvidedMaterial Analysis
Mill Material Analysis Can Be ProvidedProcess
Casting, ForgingName
ThimblePropety
Rigging HardwareStatus
Stock or MpsCertifications
ISO9001,CE,BV,SGSNotes
Special Specifications and Marks Can Be Made AccorTransport Package
Carton, Pallet, Bags or OthersSpecification
3/8 In To 4 InTrademark
YONGXINOrigin
QingdaoHS Code
7326909000Production Capacity
3000pieces/DayKey features
OEM & ODM Service: Accepts custom requirements and special specifications according to customer needs.
High Safety Standard: MBS is 6 times WLL or 4 times WLL ensuring high safety for lifting applications.
Multiple Material Options: Available in Carbon steel, Alloy steel, and Stainless steel 304 or 316.
Diverse Surface Finish: Options include Hot Dipped Galvanized, Electro Galvanized, Color Painted, and Polished.
Quality Certification: Certified by ISO9001, CE, BV, and SGS with Mill Test Certificate provided.
Factory Direct Supply: Direct manufacturer from Qingdao with professional suggestions and support.
Company profile

CertifiedBusiness Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2019-08-01 CertifiedNearest Port: Qingdao PortAverage Response Time: ≤8.91h CertifiedTerms of Payment: LC, T/T, PayPal, etc.
About Our Factory & Business Background
AddressBei'an Industrial Park, Jimo City, Qingdao, Shandong, China
Plant Area11900 square meters
Number of Employees69
Registered Capital1,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsRigging Hardware, Trailer, Marine Hardware, Container Hardware, Stamping Part, Welding Part, Sling Ring, Sling Hook, Chain Hardware, Steel Wire Rope Hardware
Production MachinesHardness Tester, Tension Machine, Forging line, Shot blasting Machine, Grinding machine, Punching Machine, Wire rope press machine, Cuttting Machine, Salt spraying tester
R&D Engineers4 people
Our Industry Experience & Global Business Record
Year of Establishment2011-09-20
Main MarketsNorth America, South America, Europe
Number of Foreign Trading Staff7
Overseas Agent/BranchNo
Product Q&A
Q:Do you offer OEM and ODM services?
A:
Yes, we accept OEM and ODM services. Please inform us of your specific requirements.
Q:What is the Minimum Order Quantity (MOQ)?
A:
The MOQ is 100 pieces per size. Mix orders are acceptable.
Q:Can I get samples to check quality?
A:
Yes, samples are available. The sample fee will be refunded after your first order.
Q:Are you a factory or a trading company?
A:
We are a factory. You are welcome to visit our factory at any time.
Q:What is the delivery time?
A:
Delivery takes 15-30 days after order confirmation.
Send Inquiry
*To:
QINGDAO YONGXIN RIGGING CO., LTD.
QINGDAO YONGXIN RIGGING CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
G80 Hot DIP Galvanized Connecting Link for Construction Sites
US$0.01-1.00
1 Piece(MOQ)
Hot Sell Alloy Steel C Link, Zp Snap Hook
US$0.01-1.00
1 Piece(MOQ)
Hot Sale A342 Red Weldless Alloy Master Link
US$0.10-30.00
1 Piece(MOQ)
Durable Galvanized Steel Socket Clevis Link for Electrical Systems
US$8.20-8.50
500 Pieces(MOQ)
Heavy-Duty Galvanized Steel Clevis Extension Link for Rigging Applications
US$8.20-8.50
500 Pieces(MOQ)
Hot Selling Painted Pear Shaped Forged Steel Master Link for Rigging Accessories
US$0.01-1.00
1 Piece(MOQ)
Hot Dip Galvanized G80 High Strength Connecting Link for Chain Sling Connection
US$0.20-8.00
100 Pieces(MOQ)
Us Type Drop Forged Galvanized Double Clevis Link
US$0.36-0.50
100 Pieces(MOQ)
Electro Galvanized Forged G100 Connecting Link Engineering Lifting Connection Fitting
US$0.60-20.00
100 Pieces(MOQ)
Drop Forged Open Type Mining Connecting Link for Scraper Conveyor Round Link Chain
US$0.10-0.15
100 Pieces(MOQ)
Rigging Hardware Fitting Carbon Steel Galvanized Quick Link Repair Link
US$0.05-5.90
100 Pieces(MOQ)
Wholesale Custom High Quality Hot Selling Drop Forged Rigging Hardware G80 Chain Connecting Link
US$1.52-15.60
1,000 Pieces(MOQ)
Galvanized Lap Repair Link Forged Lap Links Repair Accept Custom
US$0.40
100 Pieces(MOQ)
Wholesale Custom High Quality Weldless Chain Fitting Double Clevis Link G80 Alloy Steel Master Link A342
US$0.465-0.50
500 Pieces(MOQ)
Hot DIP Galvanized New Forged Weldless End Link for Sales
US$0.50-15.00
500 Pieces(MOQ)
1/2" A342 Forged Alloy Steel Galvanized Master Link with Grab Hook
US$0.35-5.20
10 Pieces(MOQ)
ASME B30.26 Factory wholesale 7/8 Inch A347 US type Forged Master Link Assembly for Connecting
US$0.30-17.00
100 Pieces(MOQ)
China Factory Supply Manufacturer Strong Hardware Alloy Environmental Galvanized Master Link
US$0.30-100.00
500 Pieces(MOQ)
247 Double Clevis Connecting Link Pained and Galvanized
US$0.40
100 Pieces(MOQ)



















