Powered by Made-in-China.com
Oil Drilling Service Truck-Mounted 250HP Xj250 Workover Rig/Pulling Unit/Petroleum Workover Rig
US$100,000.00-4,000,000.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
One YearWarranty
One YearModel NO.
AllManufacturing Process
StampingSurface Treatment
OxidationOperation Pressure
Atmospheric PressureMaterial
Cast SteelTransport Package
Common Export PackagingTrademark
YINGPAIOrigin
HebeiHS Code
84139100Production Capacity
50000pieces/YearKey features
High Rated Hook Load: Rated hook load of 400kN (90,000 lbf) for heavy-duty workover operations.
Deep Workover Capability: Workover depth up to 3,200m (10,500ft) with 2-7/8'' DP.
Powerful Drawwork System: 185kW (250hp) double drum drawwork with max line pull of 145kN.
Flexible Customization: Supports OEM/ODM, full customization, and minor customization options.
One Year Warranty: Comprehensive one-year warranty coverage for the equipment.
High-Speed Hoisting: Hook hoisting speed of 1.5m/s (4.92ft/s) for efficient operations.
Robust Carrier System: Self-propeller carrier with max travel speed of 60km/h (37mph).
Quality Assurance: 100% finished product inspection including visual and function checks.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 5 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤5.58h
About Our Factory & Business Background
AddressRoom 102, East Office Building, No. 45 Pengwan Road, Qingdao Free Trade Zone, Shandong 2026-1858(a), Qingdao, Shandong, China
Plant Area100 square meters
Number of Employees7
Registered Capital3,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Set
Supply Chain Partners2
Our Production Capability & Technical Expertise
Main ProductsDrilling Rig Equipment and Parts, Mud Pump and Parts
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2019-07-19
Main MarketsEurope, Africa
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015
Cooperated with Fortune 500No
Product Q&A
Q:How long is the delivery time?
A:
It will take about 15-35 days to finish an order, but the exact time is according to actual situation.
Q:Can you offer OEM or design services?
A:
Yes, we have our own design department. We can make OEM products according your requirements.
Q:How long is the warranty?
A:
1 year
Q:What is the maximum workover depth?
A:
The workover depth is up to 3,200m (10,500ft) with 2-7/8'' DP.
Q:What is the rated hook load?
A:
The rated hook load is 400kN (90,000 lbf).
Send Inquiry
*To:
Qingdao Yingpai Import & Export Trading Co., Ltd.
Qingdao Yingpai Import & Export Trading Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Truck Mounted Coiled Tubing Unit Mobile Drilling Rig
US$1,300,000.00
1 Piece(MOQ)
API Workover Xj350 Xj550 Xj750 Oiled Drilled Truck-Mounted Drill Oil Rig
US$15,000.00-20,000.00
1 Piece(MOQ)
Xj450 Truck Workover Rig Matching Mud Pump Mud Tank Well Control Equipment for Oil Drilling Site
US$50,000.00-1,200,000.00
1 Set(MOQ)
112FT (34m) Mast with Crown Block for Xj550 Workover Rig Truck Mounted Drilling Rig
US$8,000.00
1 Piece(MOQ)
China Xj650 Workover Rig Truck Mounted 65 Ton Hook Load Oil Well Workover Equipment New & Refurbished Oilfield Service Machine
US$50,000.00-1,200,000.00
1 Set(MOQ)
a Pi Oilfield Oil Well Drilling Tool Cheap Workover Rig 350HP 550HP
US$12,000.00-30,000.00
1 Set(MOQ)
Mounted Coiled Tubing Unit LG360/38-5500 Truck Mounted Mobile Drilling Rig
US$1,300,000.00
1 Piece(MOQ)
Xj750 Truck Mounted Workover Rig 750kN Hook Load Onshore Oil Gas Well Service Equipment Mobile Oilfield Well Maintenance Machine
US$50,000.00-1,200,000.00
1 Set(MOQ)
Gas Well Bore Hole Truck Mounted Mobile Workover Rig Yg60 Travelling Hook
US$8,800.00
1 Piece(MOQ)
Oil Drilling Rig / Well Drilling Rig / Borehole Drilling Machine / Truck Mounted Water Well Drilling Rig
US$100,000.00-4,000,000.00
1 Piece(MOQ)
API 4f 50t /250HP Truck Mounted Workover Rig Double Drum for Oilfield
US$128,000.00-560,000.00
1 Set(MOQ)
115FT (35m) Mast with Crown Block for Xj650 Workover Rig Truck Mounted Drilling Rig
US$8,000.00
1 Piece(MOQ)
Xj250 Truck Mounted Workover Rig Onshore Oilfield Land Workover Rig
US$50,000.00-1,200,000.00
1 Set(MOQ)
Portable Truck-Mounted Drilling Rig for Coiled Tubing Operations
US$1,290,000.00
1 Piece(MOQ)
Oil Drilling Service Truck Mounted 250HP Xj250 Workover Rig/Traction Unit/Oil Workover Rig
US$5,000.00-4,000,000.00
1 Piece(MOQ)
High-Performance Land Modular Drilling Rig Equipment for Oil Industry
US$20,000.00-100,000.00
1 Set(MOQ)
3200m Depth Vehicle-Mounted Oil Workover Rig Xj250
US$650,000.00-1,500,000.00
1 Piece(MOQ)
Dq30bq Top Drive System for 3000m Land Drilling Rig and Workover Rig
US$200,000.00-699,999.00
1 Piece(MOQ)



















