Powered by Made-in-China.com
114mm DTH Drill Pipe High Strength for Mining Water Well Drilling
US$302.99
30 Pieces
Product specifications
OD
Length
Product profile
Customization
AvailableAfter-sales Service
24h OnlineWarranty
3 MonthsModel NO.
YHCertification
ISO 9001:2000Standard
GBSurface Treatment
Spray-PaintManufacturing Process
Friction WeldingMaterial
Carbon SteelThread
31/2 Reg,3becoOd
114mmWall Thickness
8mmLength
4000mm,5000mm,6000mmNet Weight
136kg,146kg,190kgTransport Package
BundlesSpecification
OD 114mmTrademark
Yuanhang YushangOrigin
ChinaHS Code
84314320Production Capacity
250000PCS/YearKey features
Premium Steel Grades: Offers both Premium and Standard grades for maximum durability and wear resistance.
In-House Heat Treatment: Tool joints and adaptors undergo hardening and tempering for optimal thread hardness.
24/7 Online Support: Provides 24-hour online after-sales service for immediate assistance.
Full Customization Options: Supports customization from samples, designs, minor adjustments, and full customization.
ISO 9001:2000 Certified: Manufacturing process meets international quality management standards.
100% Finished Product Inspection: Every product undergoes visual and functional inspection before delivery.
Fast Lead Time: Peak and off-peak season lead times are both within 15 working days.
Diverse Size Range: Available in multiple diameters (76mm to 140mm) and lengths (3000mm to 6000mm).
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 Years CertifiedNearest Port: Qingdao portAverage Response Time: ≤3.98h
About Our Factory & Business Background
AddressRoom 1308, Building 1, 7 Yuxi Lu, Shunyi Area, Beijing, China
Plant Area7522.56 square meters
Number of Employees98
Registered Capital1,000,000 RMB
Terms of PaymentT/T
International Commercial Terms(Incoterms)FOB, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Supply Chain Partners10
Our Production Capability & Technical Expertise
Main ProductsRC Drill Pipe,DTH Drill Pipe,Water Well Drill Rig,Core Drilling Rig,Deck Bushing & Stablizer
Production Lines1
Production MachinesCutting machine, Upsetting Equipment, Lathe, Boring lathe, Friction Welding Equipment, CNC Machineing Center Equipment, Heat Treatment Equipment, Rough machining lathe, Friction welding Equipment
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers3 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2020-04-22
Main MarketsNorth America, South America, Europe, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice80%~100%
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the warranty period?
A:
We provide a 3-month warranty for this product.
Q:Is customization available?
A:
Yes, we offer full customization, minor customization, and customization from samples or designs.
Q:What is the lead time for orders?
A:
The average lead time is within 15 workdays, regardless of peak or off-peak seasons.
Q:What material is used for the drill pipe?
A:
The drill pipe is made of carbon steel, available in Premium and Standard grades.
Q:Do you provide after-sales support?
A:
Yes, we offer 24-hour online after-sales service.
Send Inquiry
*To:
Yuanhang Yushang(Beijing) Technology Co., Ltd.
Yuanhang Yushang(Beijing) Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Drilling Tools Drill Rod Drill Pipe for DTH Drilling Rig
US$40.00-80.00
20 Pieces(MOQ)
76mm Drill Rods DTH Drill Pipe for DTH Drilling
US$30.00-270.00
10 Pieces(MOQ)
Stable Quality Geological Auger Rod Drill Pipe for Irrigation and Water Well Drilling
US$60.00-150.00
50 Pieces(MOQ)
Durable Water Well Drill Pipe for Reliable Deep Drilling Solutions
US$94.00
30 Pieces(MOQ)
Standard Thread Type DTH Drill Pipe for Mining and Water Well Drilling Rig
US$80.00
1 Piece(MOQ)
High Strength Drilling Pipe 1-6m 76mm Diameter Mining Machinery Parts Integral Drill Pipe
US$75.00-90.00
1 Set(MOQ)
High Level Quality 1.5m DTH Drill Pipe Used for Water Well Drilling
US$1.00
1 Piece(MOQ)
High Strength 102mm Seamless Drill Pipe for Water Well Drilling Work
US$158.81
30 Pieces(MOQ)
Sollroc 2 3/8" Reg-4 1/2" Reg DTH Drill Pipe
US$200.00
1 Piece(MOQ)
DTH Drilling Pipe/114mm Drill Pipe/89mm Drill Rod
US$29.00-85.00
1 Piece(MOQ)
High Performance Spiral Drill Pipe for Efficient Well Drilling
US$60.00-400.00
10 Pieces(MOQ)
Hard Rock Exploration Water Well Drill Pipe Customizable Length
US$48.00-57.00
1 root(MOQ)
Drill Pipe Mining Water Well Drilling /Rod for Rock Drilling
US$500.00-1,200.00
1 Piece(MOQ)
Factory Custom HDD Drill Rods Heavy Wall Drill Pipe Diameter for Geological Exploratio Water Well Rig
US$30.00-200.00
1 Piece(MOQ)
3m 3000mm Drill Pipe Rod Deep Oil Well Borehole Drilling Rig 1000mm Pipes
US$29.00-85.00
1 Piece(MOQ)
114mm Down The Hole Drill Pipe for Rock and Water Well Drilling
US$302.99
30 Pieces(MOQ)
Down The Hole Drill Pipe 89mm for Water Well Drilling
US$155.00-180.00
50 Pieces(MOQ)
8 Inch Borewell Slotted Pipe for Water Well Drilling with Stable Performance
US$55.00-75.00
1 Piece(MOQ)


















