SourcingAI
Try for free
Powered by Made-in-China.com
Intelligent Temperature Control Air Cooler Injection Mould with Hot Runner
US$50,000.00
1-2 Sets
US$30,000.00
3+ Sets
Sample price:US$3.00/set.Request sample

Product profile

Customization

Available

Warranty

1 Year

Shaping Mode

Injection Mould

Model NO.

YD00221

Surface Finish Process

Polishing

Mould Cavity

Single Cavity

Plastic Material

ABS

Process Combination Type

Single-Process Mode

Application

Car

Runner

Hot Runner

Design Software

UG

Installation

Fixed

Certification

TS16949

Standard

HASCO

Customized

Customized

After-sales Service

1 Year

MOQ

1 Set

Lead Time

45 Days

Transport Package

Wooden Box

Specification

600mm*500mm*400mm, ABS material

Trademark

Auto Mold

Origin

Zhejiang, China

HS Code

8480719090

Production Capacity

350 Sets

Key features

Hot Runner System: Intelligent temperature control air cooler injection mould with hot runner for efficiency.
Customized Design: Fully customizable mould solutions based on specific cooler product designs.
Long Mold Life: Designed for 500,000 shots with durable ABS material and polishing finish.
TS16949 Certified: Meets high-standard quality inspection and automotive industry requirements.
Fast Shipping: EU: 5-7 days, North America: 7-10 days, APAC: 10-15 days.
Free Shipping: Free shipping on orders over $500 with real-time logistics tracking.
1 Year Warranty: Comprehensive 1-year warranty covering mechanical defects and free replacement for shipping damage.

Company profile

Taizhou Yuda Mold Co., Ltd.
High Repeat Buyers ChoicePatents Awarded
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Ningbo Port, Shanghai PortAverage Response Time: ≤24h

About Our Factory & Business Background

AddressNo. 28, Houshi Road, Xinqian Street, Huangyan District, Taizhou City, Taizhou, Zhejiang, China
Plant Area4566 square meters
Number of Employees111
Registered Capital5,000,000 RMB
Terms of PaymentLC, T/T, Small-amount payment
International Commercial Terms(Incoterms)FOB, EXW, CIF, CFR
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 set
Supply Chain Partners100

Our Production Capability & Technical Expertise

Main ProductsInjection Molds
Production Lines17
Production MachinesCNC Machining Center, Spark Machine, Drilling Machine, Mold Closing Machine, Injection Molding Machine
QA/QC inspectors6 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers12 people
Traceability of Raw MaterialsNo

Our Industry Experience & Global Business Record

Year of Establishment2020-05-27
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO45001:2018
Cooperated with Fortune 500No

Product Q&A

Q:Can the cooler mould be customized for different cooler models?
A:
Yes. We offer fully customized mould solutions based on your specific cooler product designs and technical requirements.
Q:What is the lead time for the cooler mould?
A:
Generally, it takes 45 days. The exact time may vary depending on the complexity of the mould.
Q:How to ensure the quality of the cooler mould?
A:
We conduct strict quality inspections at every stage of production, including material testing, dimensional accuracy checks, and trial runs, to ensure the mould meets high standards.
Q:How to maintain molds?
A:
Mold maintenance requires regular upkeep: 1. Cleaning after production to remove residues. 2. Rust prevention with anti-rust oil. 3. Lubrication of moving parts. 4. Regular inspection for loose components or damage. 5. Proper storage in dry, ventilated areas. 6. Professional overhaul after specific cycles.
Q:What types of steel are used for automotive part molds?
A:
Common steels include P20 (pre-hardened), 718 (high strength), H13 (hot-work), S136 (stainless), NAK80 (high hardness), 2311 (low-alloy), 2344 (high-hardness), and 8407 (heat resistant), each suited for specific automotive applications.

Send Inquiry

*To:Taizhou Yuda Mold Co., Ltd.Taizhou Yuda Mold Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Quality Custom Making Injection Plastic Air Cooler Mould
Made-in-China.com