SourcingAI
Try for free
Powered by Made-in-China.com
Multi USB Cable Android Auto Apple Car Play Retractable Data Sync Christmas Gifts for Women Personalized New USB Type C Fast Charging Cable Long Leads
US$1.98
20-299 Pieces
US$1.88
300-1,999 Pieces
US$1.78
2,000-4,999 Pieces
US$1.68
5,000-19,999 Pieces
US$1.48
20,000+ Pieces
Sample price:US$4.00/piece.Request sample

Product profile

Customization

Available

Interface Type

USB

Connector

USB

Universal

Universal

Cable Length

4 to 5.9 Feet

Switch

Without Switch

Data Transmission Function

Data Transmission Function

Retractable

Retractable

Charging Function

Charging Function

IC Chip

Without IC Chip

Customized

Customized

Product Material

ABS

Product Packaging

Cardboard Box

Length

1.1m

Copper Wire Specifications

4-Core Wire 55+55+16+16

Compatible with Mobile Phones

Type-C, Android

Transport Package

Original Packaging

Specification

158*90*25mm

Trademark

OEM

Origin

China

HS Code

8473309000

Production Capacity

100000000

Company profile

Shenzhen Yuntan Technology Co., Ltd.
High Repeat Buyers ChoiceIn-stock CapacityMinor CustomizationFast Delivery
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 2 years CertifiedNearest Port: Shenzhen Port, Hong Kong PortAverage Response Time: ≤8.66h

AI-Powered supplier vetting

SummaryThe supplier is an electronics and related-products manufacturer/trader engaged in research, sales, domestic trade, e-commerce, and import/export. It offers OEM, ODM, 3D design, and multiple customization modes, supported by R&D engineers and documented design-development records. Production evidence includes three lines, stated product output capacities, inventory capability, finished-product inspection instructions, and a lead time within 15 workdays during off-peak periods. Customer complaints are handled through a documented procedure with records, while no written corrective and preventive action procedures or records were identified. The supplier exports domestically and to Europe and is located near Shenzhen and Hong Kong ports. Evidence is insufficient to confirm certifications, detailed financial credibility, or named customer cases. It has no SDK, overseas warehouse, overseas showroom, or overseas agent/branch.
Supplier typeThe supplier operates across research and sales of electronic and related products, e-commerce, domestic trade, import/export, and several commercial product categories. Its listed products include USB cables, data cables, power banks, phone holders, gifts, and fans, indicating a manufacturer/trader profile focused on electronics and promotional or consumer products.
After-Sales capabilityThe supplier has a clear customer-complaint procedure with followed records, and its technology engineers provide technical support for production and after-sales service. However, no written corrective and preventive action procedures or records are available, indicating a documented gap in corrective-action management.
R&D capabilityR&D engineers handle customer requirement confirmation, technical support, and new product development; design input, output, review, verification, and validation documents are available for audit. The supplier reports new products in the past year and provides 3D design and ODM services, although no SDK is available.
Production capacityThe supplier operates three production lines, reports substantial product-specific output capacities, has inventory capability, and uses documented, uniformly followed finished-product inspection instructions. It also has valid manufacturing contracts with associated subcontractors and states an off-peak lead time within 15 workdays.
Customization capabilityThe supplier explicitly provides 3D software design, OEM and ODM services, and customization from samples, designs, full customization, minor customization, and flexible customization. These services indicate broad product-development and customization coverage.

Send Inquiry

*To:Shenzhen Yuntan Technology Co., Ltd.Shenzhen Yuntan Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like