SourcingAI
Try for free
Powered by Made-in-China.com
Electric 380L Dustbin Capacity Sweeper Trucks
US$6,500.00
1-2 unit
US$6,400.00
3+ unit
Sample price:US$6500.00/unit.Request sample

Product profile

Customization

Available

After-sales Service

Warranty

Warranty

1 Year

Model NO.

ZB-ES02

Power Supply

Battery

Control

CNC

Automation

Automatic

Operation Type

Ride-on

Type

Wafer Brushes

Brush Hardness

Medium Hardness

Brush Structure

Disc Type

Application

Warehouse

Customized

Customized

Condition

New

Sweep Width

1550-2600mm

Drive Motor

2.2kw Permanent Magnet Synchronous Heavy-Duty Moto

Tank Capacity

800L

Dustbin Capacity

380L

Power Source

48V200ah Lead-Acid Maintenance-Free Battery

Water Gun Range

10m

High Pressure Rotary Antiaircraft Gun Ra

8-10m

Rear Sprinkler Range

6m

Reel Length

15m

Main Brush Length

800mm

High Pressure Pump Maximum Flow

10L/Min

Working Speed

0-9km/H

Travel Speed

Travel Speed

Turning Radius (Turn in Place)

5130mm

Transport Package

Container/Wooden Case

Specification

3750*2500*2100mm

Trademark

Zhenbang/ZB

Origin

Shandong Province, China

HS Code

8705909990

Production Capacity

2, 000 Units/Year

Key features

Lifetime Warranty Coverage: Lifetime guarantee with 12-month warranty, free repair parts, and video call support.
Customizable Sweep Width: Sweep width adjustable from 1550mm to 2600mm to fit various cleaning needs.
Versatile Application Scenarios: Ideal for bike lanes, squares, parks, sports venues, and exhibition centers.
OEM and ODM Services: Professional design team available to translate ideas into perfect custom designs.
Flexible Customization Options: Offers full customization, minor customization, and customization from samples or designs.
Low MOQ for Samples: Minimum Order Quantity is 1 piece, allowing easy quality checks with minimal cost.

Company profile

Chengde Zhenbang New Energy Technology Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceMulti-language PioneerPatents Awarded
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 4 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤7.72h

AI-Powered supplier vetting

SummaryThe supplier is a factory specializing in manufacturing, with strong customization and R&D capabilities, offering both OEM and ODM services. Despite having a robust service procedure and a diverse export market, it lacks overseas warehouses, showrooms, and trade show participation. Financial capability appears weak, with no recorded revenues or profits over recent years, but it holds a CE certification and conducts regular fire drills, indicating a commitment to sustainable practices.
Supplier typeThe supplier is a manufacturing factory.
CertificationsThe supplier holds a CE certification.
After-Sales capabilityThe supplier has written procedures and records for effective complaint handling.
Financial creditThe supplier shows no financial activity, with zero revenues or profits over recent years.
R&D capabilityThe supplier has introduced new products in the past year and provides ODM services.
Production capacityThe supplier operates one production line with an annual output between US$1 Million and US$2.5 Million.
Customization capabilityThe supplier offers extensive customization options, including full and flexible customization.

Product Q&A

Q:Are you a manufacturer or a trading company?
A:
We are factory located in Hebei province, China and we have a professional foreign trade team at your service around the clock.
Q:Can I order a sample to check your quality?
A:
Yes for sure. Our MOQ is 1 piece and we charge only a little more than the production price.
Q:How long can I expect to get the sample?
A:
If we have stock, we can ship out within 5 business days after receipt of your full payment. If we are out of stock, the production takes about 20 days.
Q:Can you do OEM and ODM for us?
A:
Yes we accept BOTH. We have a professional designer team who can translate your ideas into perfect design. Contact us for more details NOW.
Q:How long is your production time?
A:
Generally for Non-OEM orders, our lead time is 20-25 days, and 35-45 days for OEM orders.

Send Inquiry

*To:Chengde Zhenbang New Energy Technology Co., Ltd.Chengde Zhenbang New Energy Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like