SourcingAI
Try for free
Powered by Made-in-China.com
Offsite Construction Design Using Durable Anti-Corrosion Steel Materials
US$55.00
100-299 Square Meters
US$53.00
300-999 Square Meters
US$49.00
1,000+ Square Meters
Sample price:US$5.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

Installation and Commissioning, Technical Guidance

Architecture

Modern Style

Model NO.

3001

Certificate

ISO

Material

Steel Structure

Type

Detached Villa

Main Structure

Steel Frame Structure

Steel Type

High-Strength Steel (Q345b)

Surface Treatment

Galvanization or Coating, Anti-Corrosion, and Fire

Floor/Foundation Material

Wear-Resistant Floor

Doors and Windows

Steel Safety Door Aluminum Alloy

Service Life

50+ Years

Other Accessories

Lighting System, Ventilation System, Fire Protecti

Transport Package

Wooden Case Packaging: Pallet Packaging: Strapping

Specification

Customized to meet your requirements.

Trademark

55491472

Origin

China

HS Code

7308900000

Production Capacity

100000 Tons/Years

Key features

Customizable Modular Design: Tailored layouts for single-family or multi-unit complexes with effortless expansion.
Quick On-Site Assembly: Pre-manufactured components enable rapid installation and minimal construction time.
50+ Year Service Life: Robust steel structure ensures long-lasting durability and reliability.
High-Strength Steel Frame: Constructed with Q345b steel and anti-corrosion galvanization or coating.
Energy Efficient Insulation: EPS insulation and natural light design significantly reduce heating and cooling costs.
ISO Certified Quality: Manufactured under ISO standards with 100% visual inspection for finished products.
Comprehensive After-Sales Support: Includes installation, commissioning, and technical guidance services.
Flexible Customization Options: Full customization available from samples or designs with OEM/ODM services.

Company profile

Zhanghe (Ningbo) Equipment Manufacturing Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceYears of Export ExperienceMulti-language Pioneer
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc.Export Year: 2020-01-15Nearest Port: Ningbo Port, Shanghai portAverage Response Time: ≤10.94h

About Our Factory & Business Background

AddressNo. 99, Longxing Road, Wuxiang Town, Yinzhou District, Ningbo, Zhejiang
Plant Area1500 square meters
Number of Employees46
Registered Capital120,000,000 RMB
Terms of PaymentLC, T/T, PayPal, Western Union
International Commercial Terms(Incoterms)FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsSteel Structure
Production Lines3
Production MachinesAssembly welding machine, Auto arc-submerging welder, Bending machine, CNC drilling machine, Correcting machine, Crane, Cutting machine, Forming machine, Gas bottle, Paint spraying room, Plate shearing machine, Shot blasting machine
QA/QC inspectors3 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers8 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment1999-11-22
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Repeat Buyers Choice50%~80%
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What is the expected service life of the housing unit?
A:
The housing units are designed for a service life of over 50 years.
Q:Can the design be customized to my specific needs?
A:
Yes, we offer full customization from samples or designs, including flexible customization options.
Q:What materials are used for the main structure?
A:
The main structure is a steel frame made of high-strength Q345b steel with anti-corrosion treatment.
Q:How long does the assembly process take?
A:
Assembly is significantly reduced due to pre-manufactured components, with lead times of 1-3 months in peak season and within 15 workdays off-season.
Q:Is the product energy efficient?
A:
Yes, the units use EPS insulation in walls and roofs and strategic natural lighting to reduce energy costs.

Send Inquiry

*To:Zhanghe (Ningbo) Equipment Manufacturing Co., Ltd.Zhanghe (Ningbo) Equipment Manufacturing Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Durable Fire Resistant Wall Material for Modular Housing
Made-in-China.com