SourcingAI
Try for free
Powered by Made-in-China.com
Uht Milk Processing Plant Dairy Milk Production Line Machine Yogurt Production Line
US$50,000.00
1 Piece

Product profile

Customization

Available

After-sales Service

Provide Equipment Inspection Certificate and Manua

Warranty

1 Year

Process

Mild Processing

Power Source

Electric

Certification

ISO9001

Automatic Grade

Semi-Automatic

Application

Milk, Yogurt, Milk Powder, Cheese

Customized

Customized

End Product

Milk / Yogurt

Efficient

Enegy Saving

Material

SUS304/316L

Transport Package

Wooden Carton

Specification

customized

Trademark

Zhangjun

Origin

Jiangsu, China

HS Code

8424899990

Key features

Full Customization Options: Offers full customization, minor customization, and flexible customization from samples or designs.
High-Quality SUS304/316L Material: All equipment parts constructed from SUS304 or 316L stainless steel for durability and hygiene.
ISO9001 Certified Quality: Manufacturing process certified under ISO9001:2015, ISO45001:2018, and ISO14001 standards.
1-Year Comprehensive Warranty: Includes equipment inspection certificate and manual with a 1-year warranty coverage.
Energy Efficient Design: Designed for energy saving with efficient heat transfer and automated processes.
Versatile Product Application: Suitable for processing milk, yogurt, milk powder, cheese, cream, and butter.
Semi-Automatic Operation: Features semi-automatic grade for efficient production with manual stepless shift capabilities.
Fast Lead Time: Peak and off-peak season lead times are both within 15 working days.

Company profile

Zhangjun Machinery Equipment (Taizhou) Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoicePatents Awarded
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedNearest Port: Shanghai PortAverage Response Time: ≤4.60h CertifiedTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressNo. 88-1 Yunhe North Road, Jiulong Town, Hailing District, Taizhou, Jiangsu, China
Plant Area12307 square meters
Number of Employees68
Registered Capital10,500,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Set
Supply Chain Partners20

Our Production Capability & Technical Expertise

Main ProductsMixing Tank, Stainless Steel Tank, Egg Production Line, Beverage Production Line, Pasteurization Machine, Ice Cream Production Line, Porridge Production Line, Dairy Production Line
Production Lines3
Production MachinesDecoiling Machine, Shearing Machine, Plate Laser Cutting Machine, Pipe Laser Cutting, Bending Machine, Veneer Reeling Machine, Sawing Machine, Lathe, Automatic Welding Machine, Polishing Machine, Reshaping Machine
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers5 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2020-07-24
Main MarketsDomestic
Repeat Buyers Choice80%~100%
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What materials are used for the production line?
A:
The equipment is made of SUS304 or SUS316L stainless steel to ensure high hygiene and durability.
Q:Can the machine be customized?
A:
Yes, we offer full customization, minor customization, and flexible customization based on your samples or designs.
Q:What is the warranty period?
A:
We provide a 1-year warranty which includes an equipment inspection certificate and a user manual.
Q:What products can this line produce?
A:
This line is designed for milk, yogurt, milk powder, cheese, cream, and butter production.
Q:What is the lead time for production?
A:
The average lead time is within 15 working days for both peak and off-peak seasons.

Send Inquiry

*To:Zhangjun Machinery Equipment (Taizhou) Co., Ltd.Zhangjun Machinery Equipment (Taizhou) Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Small Scale Yogurt Production Line From Milk to Yogurt
Made-in-China.com