SourcingAI
Try for free
Powered by Made-in-China.com
Solef PVDF 11010 (Solef 11010/0001) Polyvinylidene Fluoride Resin
US$22.00-35.00
25 kg

Product profile

Customization

Available

Feature

Hydrolytic Degradable

CAS No.

24937-79-9

Model NO.

11010/0001

Material

PVDF

Usage

Engineering Plastics

Plastic Properties After Heated

Thermoplastic Plastics

Plastic Forming Method

Extrusion

Color

Natural

Lead Time

3 Days After Deposit

Sample

Available

Visiting of Office

Available

Inspection of Material Before Shipping

Available

Transport Package

25kg/Bag

Specification

11010/0001

HS Code

3904690000

Production Capacity

5000kgs/Monthly

Key features

Superior Chemical Resistance: Tremendous resistance to a wide range of aggressive chemicals.
UV and Sunlight Stability: Outstanding resistance to sunlight and UV exposure without additives.
High Temperature Rating: Rated for temperatures up to 150 degrees Celsius (RTI 150).
Excellent Flame Properties: Features excellent burn characteristics with low flame and smoke.
High Purity Grade: Extremely high purity suitable for the most demanding applications.
Flexible Customization: Offers flexible customization options for specific needs.
Global Shipping Experience: Extensive experience in air and ocean transportation to overseas markets.
Low MOQ Requirement: Minimum Order Quantity is just 1 unit.

Company profile

Zhejiang Zhongfu Industrial Limited
Importers and ExportersYears of Export ExperienceLow MOQ
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Flexible customization CertifiedExport Year: 11 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤15h CertifiedTerms of Payment: LC, T/T

AI-Powered supplier vetting

SummaryZhejiang Zhongfu Industrial Limited is identified as a trading company with a Hangzhou factory location and a business scope covering plastic raw materials and related products. It reports five production lines, six to ten quality-control staff, and specified PEI, PEEK, PPSU, PSU, and PPS output. The supplier primarily exports to Europe and accepts several trade and payment terms, with stated lead times of within 15 working days in both peak and off-season. However, it reports no SDK, no recent new products, no ODM, no notable-brand OEM, no overseas showroom, no overseas agents or branches, and no offline trade-show participation. Service, corrective-action, complaint-handling, environmental, and fire-drill documentation is incomplete or unknown. An audit by TUV Rheinland is listed, but the reported evaluation result is 0; the meaning of this value is not provided.
After-Sales capabilityThe supplier has no overseas showroom, agents, branches, or reported overseas-service countries, and has not participated in offline trade shows. It has written procedures for supplier assessment, corrective and preventive actions, and customer complaints, but no records are available, limiting evidence of effective implementation.
R&D capabilityThe supplier reports no available SDK and no new products during the past year. It does offer flexible customization, while the market description references innovation in the European engineering-plastics market rather than documenting the supplier’s own innovation performance.
Production capacityThe supplier reports five production lines, six to ten quality-control staff, and specified output for PEI, PEEK, PPSU, PSU, and PPS. It states lead times within 15 working days in both peak and off-season and identifies five qualified suppliers for service capability, providing positive capacity indicators, although the trading-company classification and lack of supporting production records limit verification.
Customization capabilityThe supplier explicitly provides flexible customization services. However, it does not provide ODM services, does not offer OEM for popular brands, and reported no new products during the past year, indicating customization is available but broader design-development support is limited.

Product Q&A

Q:What is the lead time for orders?
A:
The lead time is 3 days after deposit. During peak or off-season, it is within 15 workdays.
Q:What are the payment terms?
A:
We accept LC and T/T as payment terms.
Q:Is customization available?
A:
Yes, flexible customization options are available.
Q:Can I get samples?
A:
Yes, samples are available.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1.

Send Inquiry

*To:Zhejiang Zhongfu Industrial LimitedZhejiang Zhongfu Industrial Limited
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like