Powered by Made-in-China.com
Standpipe Manifold Made in China
US$5,000.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
18mthsWarranty
18mthsModel NO.
MFCertification
ISO 9001:2008, APIPower Source
PneumaticOperation Pressure
Atmospheric PressureApplicable Medium
Mud, Water, Natural Gas, Crude OilStructure
HorizontalMaterial
Cast SteelStandard
APIPkg
Wooden BoxLead Time
50daysSupply
50sets/MthTransport Package
Standard Export CartonSpecification
customizedTrademark
BAOLEEOrigin
ChinaHS Code
8431431000Production Capacity
5000 Set/YearKey features
18-Month Warranty: Comprehensive 18-month warranty coverage for mechanical defects and performance issues.
API 16C Compliance: Standard principle strictly adheres to API 16C for reliability in oil and gas operations.
Multiple Remote Options: Available in S-manual, Y-hydraulic, and Q-pneumatic configurations for versatile control.
Wide Size Range: Sizes available from 1 13/16 inches to 4 1/16 inches to fit various drilling requirements.
Durable Cast Steel: Constructed from high-grade cast steel (Material EE) for long-term durability.
Customization Available: Offers customization from samples and designs with standard API packaging.
ISO 9001 Certified: Manufacturing process certified under ISO 9001:2008 for quality assurance.
Fast Supply Rate: Monthly supply capacity of 50 sets with a standard lead time of 50 days.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤18h
About Our Factory & Business Background
AddressRoom 1808-1809 Cifi Time Plaza, Zhenjiang, Jiangsu, China
Plant Area170 square meters
Number of Employees5
Registered Capital1,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners15
Our Production Capability & Technical Expertise
Main ProductsElevator, Escalator, Bop, Spare Part of Mud Pump, Drill Pipe Elevator, Spare Parts for Drilling Rig
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-01-22
Main MarketsEurope, Southeast Asia/ Mideast, Africa, Domestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Product CertificationCE, Others
Cooperated with Fortune 500No
Product Q&A
Q:What is the warranty period for this standpipe manifold?
A:
The product comes with an 18-month warranty covering mechanical defects.
Q:What remote operation options are available?
A:
We offer S-manual, Y-hydraulic, and Q-pneumatic remote options.
Q:Does this product meet API standards?
A:
Yes, the standard principle strictly follows API 16C.
Q:What are the available size specifications?
A:
Sizes range from 1 13/16 inches to 4 1/16 inches.
Q:Can I request custom designs or samples?
A:
Yes, we provide customization services based on both samples and designs.
Send Inquiry
*To:
Zhenjiang Boral Machinery and Equipment Co., Ltd.
Zhenjiang Boral Machinery and Equipment Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Choke Manifold Made in China
US$10,000.00
1 Piece(MOQ)
Fracturing Manifold Made in China
US$5,000.00
1 Piece(MOQ)
Choke and Kill Manifold for Oil Drilling Drilling Fluid Circulation Manifold Well Control
US$30,000.00-32,000.00
1 Piece(MOQ)
OEM 114174 114175 Hydraulic Manifold Assembly for Nov Top Drive TDS System
US$1,999.00-9,999.00
1 Piece(MOQ)
OEM Hydraulic Manifold Assembly 114175 for Nov TDS Top Drive Hydraulic System
US$1,999.00-9,999.00
1 Piece(MOQ)
Reliable High-Pressure Hydraulic Manifold for Bop Control Operations
US$22,000.00-44,000.00
1 Piece(MOQ)
OEM Nov Hydraulic Manifold Assembly for TDS 114174
US$1,999.00
10 Pieces(MOQ)
High-Pressure Hydraulic Manifold for Bop Control Unit Applications
US$22,000.00-44,000.00
1 Piece(MOQ)
Hydraulic Manifold Assy 114174 for Nov TDS Top Drive System
US$1,999.00-9,999.00
1 Piece(MOQ)
Wellhead API 6A Valve Choke Manifold Price for Oil Well Drilling
US$20,000.00
1 Piece(MOQ)
Cementing Manifold From China Manufacturer
US$5,000.00
1 Piece(MOQ)
Drilling Fluid Circulating Manifold From China
US$5,000.00
1 Piece(MOQ)
Kill Manifold Manufacturer Skid Mounted Wellhead Equipments Choke & Kill Manifolds/Test Standpipe Manifold
US$2,000.00-5,000.00
1 Piece(MOQ)
High-Pressure Hydraulic Manifold for Remote Bop Operation Control
US$22,000.00-44,000.00
1 Piece(MOQ)
API 6A Bop Type Alloy Standpipe Manifold FC Type Valves
US$9,500.00-15,000.00
1 sets(MOQ)
Choke and Kill Line Drilling Well Testing Kill Manifold Wellhead Choke Manifold
US$19,000.00
1 Piece(MOQ)
Petroleum Equipment Oil and Gas Drilling 6A Choke Manifold Kill Manifold
US$18,000.00
1 Piece(MOQ)
Kill Manifold Manufacturer Skid Mounted Wellhead Equipments Choke & Kill Manifolds/Test Standpipe Manifold
US$3,000.00-30,000.00
1 Piece(MOQ)
Heavy-Duty 6A Bop Type Alloy Standpipe Manifold System
US$500.00-1,000.00
1 Piece(MOQ)



















