SourcingAI
Try for free
Powered by Made-in-China.com
Combined Counter Flow Square Cooling Tower with High Performance
US$17,000.00-20,000.00
1 Set

Product profile

Customization

Available

After-sales Service

Installation Manual and Video, Online Support

Warranty

1year

Model NO.

JFT-200-3

Cooling Method

Counter Flow

Ventilation Mode

Mechanical Ventilation

Material

FRP

Air Contact Form

Wet

Air Contact Way

Open

Tower Shape

Square

Noise Level

Low

Application Fields

Industrial

Certification

ISO, CE, CTI

Condition

New

Framework

C.S + H.D.G

Casing and Neck

FRP

Fan Stack

FRP

Basin and Collection Pit

FRP

Sprinkler System

PVC & ABS

Fan Materical

Al-Alloy

Motor

Tefc.Cl.F

Filling

PVC

Motor Supper

C.S + H.D.G

Belt

Composie Materical

Water Flow Rate

600m3/H

Fan Diameter

2400mmx3

Motor Power

7.5kwx3

Transport Package

Standard Export Packing

Specification

JFT-200-3

Trademark

JINLING

Origin

China

HS Code

8419500090

Production Capacity

1 Million Tons of Water/Year

Key features

FRP Material Construction: Constructed with FRP panels and HDG framework for durability and corrosion resistance.
Low Noise Operation: Available in low noise and super low noise models for quiet industrial environments.
ISO Certifications: Certified with ISO9001 Quality System and ISO14001 Environment System standards.
Brand Name Parts: Equipped with high-quality brand-name components including JINLING reducers.
Customizable Design: Can be made-to-measure according to specific customer design conditions and requirements.
1-Year Warranty: Comes with a comprehensive 1-year warranty covering mechanical defects.
Fast Delivery: Lead time of 20-35 days with prompt delivery from Ningbo or Shanghai ports.
Small Orders Accepted: Flexible order quantities accepted to accommodate various business needs.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading CompanyExport Year: 2006-04-05 CertifiedNearest Port: Ningbo Port, Shanghai PortAverage Response Time: ≤0.24h CertifiedTerms of Payment: LC, T/T CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, CFR

AI-Powered supplier vetting

SummaryZhejiang Jinling Refrigeration Engineering Co., Ltd. is a Chinese supplier specializing in cooling tower and refrigeration equipment. Established in 2003, with a registered capital of 50 million yuan, the company boasts a strong export presence, modern production capabilities, and several certifications, including ISO standards and CTI certification. Their innovative no-welding technology enhances production efficiency and reduces environmental impact. The company has a global reach with distributors and partners worldwide and is committed to quality management and sustainable practices.
Supplier typeThe supplier is a combined entity operating as a trade company, registered as a limited company in Zhejiang, China.
CertificationsThe supplier holds ISO9001:2015, ISO14001:2015, ISO45001:2016, and CTI certifications, indicating robust quality and environmental management systems.
After-Sales capabilityThe supplier has a global network of distributors and partners, enabling quick responses to customer needs, suggesting strong after-sales service capabilities.
Financial creditThe supplier's registered capital and substantial annual production output suggest strong financial credibility.
R&D capabilityThe adoption of advanced no-welding technology for improved efficiency and reduced environmental impact demonstrates innovation capability.
Production capacityWith over 10 production lines and a modern facility, the supplier shows substantial production capability.
Client casesThe supplier has established partnerships and distribution in multiple countries, indicating successful customer cases.

Product Q&A

Q:What is the warranty period for this cooling tower?
A:
We provide a 1-year warranty for all mechanical defects.
Q:Can the cooling tower be customized?
A:
Yes, the cooling tower can be made-to-measure according to customer design conditions and special requirements.
Q:What is the lead time for delivery?
A:
The lead time is typically 20-35 days.
Q:What materials are used in the construction?
A:
The tower features FRP panels, HDG framework, and PVC infill.
Q:Is low noise operation available?
A:
Yes, we offer both low noise and super low noise models.

Send Inquiry

*To:Zhejiang Jinling Refrigeration Engineering Co., Ltd.Zhejiang Jinling Refrigeration Engineering Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like