SourcingAI
Try for free
Powered by Made-in-China.com
CTI Certified New Design Rectangular Cross Flow Type Cooling Tower Jlt-200
US$4,000.00-6,000.00
1 Set

Product profile

Customization

Available

After-sales Service

Online Support

Warranty

12 Months

Model NO.

JLT-200

Cooling Method

Counter Flow

Ventilation Mode

Mechanical Ventilation

Material

FRP

Air Contact Form

Wet

Air Contact Way

Open

Tower Shape

Round

Noise Level

Low

Application Fields

Industrial

Certification

ISO, CE

Condition

New

Product Name

Round Cooling Tower

Frame Members

H.D.G. or Stainless Steel

Shell Body

FRP

Cold Water Basin

FRP

Filling/Eliminator/Louver

PVC or PP

Rotator

ABS

Ladder

H.D.G. or Stainless Steel

Structural Connectors

H.D.G. or Stainless Steel

Bolts,Nuts, and Washers

H.D.G. or Stainless Steel

Fan Blade Material

ABS

Fan Hub Material

ABS

Transport Package

Export Standard Packing

Specification

JLT-200

Trademark

JLCT

Origin

China

HS Code

8419500090

Production Capacity

1 Million Tons of Water/Year

Key features

CTI Certified Quality: JLT-200 model holds CTI certification ensuring high performance standards.
FRP Construction: Shell body and cold water basin made of durable FRP material.
Low Noise Operation: Designed for low noise level, suitable for industrial environments.
Flexible Material Options: Frame, ladder, and connectors available in H.D.G. or Stainless Steel.
Fast Delivery: Lead time is 20-35 days from Ningbo or Shanghai ports.
ISO & CE Certified: Product meets ISO and CE certification requirements for safety.
Mechanical Ventilation: Equipped with mechanical ventilation for efficient cooling.
Established Manufacturer: Factory established in 2003 with 223 employees and 25 R&D engineers.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading CompanyExport Year: 2006-04-05 CertifiedNearest Port: Ningbo Port, Shanghai PortAverage Response Time: ≤0.13h CertifiedTerms of Payment: LC, T/T CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, CFR

AI-Powered supplier vetting

SummaryZhejiang Jinling Refrigeration Engineering Co., Ltd. is identified as a China-based limited company with 223 employees and operations in Zhejiang. The supplied information describes more than 40 years of cooling-tower and refrigeration-equipment experience, while another slice states the JLCT business was founded in 1983; the legal-entity record lists 2003 as the establishment year. It reports integrated R&D, manufacturing, sales, and service capabilities, more than 10 production lines, 25 years of total R&D-engineer experience, and 21–30 quality-control staff. ISO 9001:2015, ISO 14001:2015, ISO 45001:2016, CTI, CTTA, and CE certifications are cited. International activity is supported by self-operated import/export rights, exports representing 41%–50% of sales, and overseas partners. The evidence supports production, certification, service-network, and R&D strengths, but does not establish customization capability, detailed customer-case outcomes, or a complete financial-credit assessment.
CertificationsThe supplier explicitly cites CTI, CTTA, and CE certifications for JLCT cooling towers, together with ISO 9001:2015, ISO 14001:2015, and ISO 45001:2016 management-system certificates. These stated certifications provide clear evidence of certification coverage across product and management systems.
After-Sales capabilityThe company states that it integrates sales and service and maintains sales points, offices, distributors, and partners in China and multiple overseas markets. It further claims these channels enable rapid responses to refrigeration requirements, supporting an established service and response network, although specific service-level metrics are not provided.
R&D capabilityThe supplier reports integrated R&D, a professional R&D team, 25 years of total R&D-engineer experience, modern production equipment, and a no-welding cooling-tower production technology described as improving efficiency and reducing environmental impact. These statements provide explicit evidence of technical development capability, though independent validation of innovation performance is not supplied.
Production capacityThe supplier reports more than 10 production lines, annual production output above the stated threshold, more than 200 employees, nearly 40,000 square meters of area, and manufacturing coverage for cooling towers and refrigeration equipment. These data explicitly support substantial production capacity and operating scale.

Product Q&A

Q:What certifications does the cooling tower have?
A:
The JLT-200 cooling tower is CTI certified and holds ISO and CE certifications.
Q:What is the lead time for delivery?
A:
The lead time is 20-35 days, shipped from Ningbo or Shanghai ports.
Q:What materials are used for the cooling tower?
A:
The shell and basin are FRP. Frame members, ladders, and connectors can be H.D.G. or Stainless Steel.
Q:What is the ventilation mode?
A:
The cooling tower uses mechanical ventilation with a counter flow cooling method.
Q:What are the payment terms?
A:
Payment terms include LC (Letter of Credit) and T/T (Telegraphic Transfer).

Send Inquiry

*To:Zhejiang Jinling Refrigeration Engineering Co., Ltd.Zhejiang Jinling Refrigeration Engineering Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

200 Ton FRP Material Open Type Cross Flow Cooling Tower
Made-in-China.com
Modular Design Closed Circuit Counter Flow Cooling Tower
Made-in-China.com