SourcingAI
Try for free
Powered by Made-in-China.com
Road Repair Asphalt Cold Patching Material
US$4.50
1 Ton

Product profile

Application

Construction

Bonding Function

Road Repair Mixture

Color

Black

Model NO.

General type cold patching material

Composition

Modified Cold Patch Asphalt, Basalt/Limestone Aggr

Morphology

Granular Bagged Mixture

Transport Package

Bag

Specification

25kg/bag

Trademark

shandongzhongke

Origin

Shandong, China

Key features

All-weather construction, not limited by seasons No need for heating, can be used directly after opening the bag. It can be applied in low-temperature and humid environments. It can be used for emerge
Strong adhesion, durable and resistant to damage Modified formula, closely adheres to the original asphalt/cement pavement, resistant to water damage, freeze-thaw damage, vehicle compaction, does not
Easy to store, cost-effective Sealed in bags for preservation, with a long shelf life and no tendency to clump; take as much as you need, and the remaining materials can be sealed for future use witho
Green and environmentally friendly The construction process has no black smoke from asphalt, no dust pollution, no pollution to water and soil, no need for heating, energy conservation, and it meets t
Wide application scope Suitable for municipal roads, highways, parks, parking lots, areas around manhole covers, bridge potholes repair, and asphalt.

Company profile

Shandong Zhongke Road New Materials Co., Ltd.
Importers and ExportersIn-stock CapacityCustomization from SamplesManagement Certification
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 2 years CertifiedNearest Port: Qingdao Port CertifiedTerms of Payment: T/T, LC, D/P, etc. CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, CFR, EXW

About Our Factory & Business Background

AddressN/a, Tai'an, Shandong, China
Plant Area13333.34 square meters
Number of Employees18
Registered Capital10,500,000 RMB
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 ton
Supply Chain Partners4

Our Production Capability & Technical Expertise

Main ProductsAsphalt Cold Mix, Crack Sealant, Self-Adhesive Anti-Crack Membrane, Geogrid, Geotextile, Geomembrane, Geocell, Drainage Hose, Crack Sealing Machine And Other Road Maintenance Materials
Production Lines2
Production MachinesMixing machine
QA/QC inspectors1 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2024-12-31
Main MarketsDomestic
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500No

Product Q&A

Q:What is asphalt cold patching material?
A:
The asphalt cold patching material is a ready-mixed road repair material made from modified asphalt, aggregates, mineral powder and functional additives at room temperature. It does not require heating for mixing and can be applied directly after opening the bag. It is specifically used for emergency repairs of potholes, cracks and damaged areas around manhole covers on the road surface.
Q:Does the product require heating for application?
A:
No heating is required. This product is a cold-weather construction material that can be applied at room temperature. It can be used in both low-temperature and humid environments. Emergency repairs can be carried out in rainy or snowy weather, and it is not restricted by seasons.
Q:How long will it take before the road can be reopened after compaction?
A:
After the compaction process is completed, traffic can be immediately reopened, significantly reducing the duration of road closure and minimizing the impact on vehicle traffic.
Q:How about the adhesion strength and durability of the product?
A:
The modified asphalt formula is tightly bonded with the original asphalt/cement pavement, resistant to water damage, freeze-thaw cycles, and vehicle heavy-load compaction. It is not prone to loosening, detachment, or cracking, effectively prolonging the pavement's service life and reducing the cost of repeated maintenance.

Send Inquiry

*To:Shandong Zhongke Road New Materials Co., Ltd.Shandong Zhongke Road New Materials Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Alginate Impression Material, Dental Supplies
Made-in-China.com
Latex SBR Latex Manufacturers CAS 9003-55-8
Made-in-China.com